Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
VesselsWind Farm UpdateContracts & TendersAuthorities
Sleipnir Installs HKZ Alpha Jacket
Grid Connection

Sleipnir Installs HKZ Alpha Jacket

Heerema Marine Contractors’ semi-submersible crane vessel Sleipnir has installed the six-legged jacket foundation for TenneT’s Hollandse Kust Zuid Alpha offshore substation. Sleipnir transported the jacket to the installation site in the Dutch North Sea and lowered it into position over the weekend.

about 6 years ago
Kriegers-Flak-CGS-Commissioning-in-Final-Stage-Launch-Delayed-Again
Grid Connection

Kriegers Flak CGS Commissioning Postponed Again

The commissioning procedures for the Kriegers Flak Combined Grid Solution (CGS) have reached the final stage, according to Energinet. The system tests on the 400 MW offshore grid link are currently ongoing. Due to the solving of technical challenges that occurred in the tests, extra time is needed a

about 6 years ago
Eiffage Métal and Engie Solutions to Build Saint-Brieuc Offshore Substation
Grid Connection

Eiffage Métal and Engie Solutions to Build Saint-Brieuc Offshore Substation

Ailes Marines has selected Eiffage Métal and Engie Solutions to manufacture the offshore substation for the 496 MW wind farm in the Bay of Saint-Brieuc. Eiffage Métal will be in charge of the engineering and construction of the upper part of the substation, housing the transformers and electrical eq

about 6 years ago
Danes Seek Permits to Start Hesselø Investigations
Grid Connection

Danes Seek Permits to Start Hesselø Investigations

The Danish Energy Agency has sent a draft permit for preliminary offshore and onshore studies related to the Hesselø offshore wind project for consultation with the relevant authorities. The feasibility study permit will give the transmission system operator Energinet, which is to be responsible for

about 6 years ago
Seafox 7 jack-up barge at the HalWin Alpha platform
Grid Connection

Seafox Wins DolWin Alpha & Gamma Contract

TenneT has selected Seafox to provide an accommodation jack-up barge for operations on DolWin Alpha and DolWin Gamma offshore platforms in Germany. The transmission system operator (TSO) was looking for an offshore jack-up barge that could accommodate up to 47 persons on board (POBs) in single cabin

about 6 years ago
An OTM sailing out of Belgium to Moray East site
Grid Connection

Final OTM En Route to Moray East Site

A couple of days after its jacket foundation was installed, the third and final offshore transformer module (OTM) has left Belgium and is now on the way to the Moray East site off Scotland. Siemens Energy, which secured a contract to deliver the three OTMs for Moray East in 2018, announced last week

about 6 years ago
Mech-Tool Engineering Secures More Work on Hollandse Kust Zuid
Grid Connection

Mech-Tool Engineering Secures More Work on Hollandse Kust Zuid

Mech-Tool Engineering (MTE) has won a contract from DryDocks World to provide fire and blast solutions for the Hollandse Kust Zuid Beta offshore substation. The contract award follows MTE completing a similar contract for the Hollandse Kust Zuid Alpha offshore platform. Under the contract, MTE desig

about 6 years ago
German Offshore Wind Operator Seeks Anti-Corrosion Squad
Grid Connection

German Offshore Wind Operator Seeks Anti-Corrosion Squad

Global Tech I Offshore Wind GmbH has issued a contract notice for repairs to the anti-corrosion coating on the offshore substation at the Global Tech I (GTI) wind farm. The contract will have a duration of 24 months, with a possibility for two one-year renewals. The tender will remain open until 25

about 6 years ago
Navigant Wins North Sea Wind Power Hub Contract
Grid Connection

Navigant Wins North Sea Wind Power Hub Contract

Navigant Netherlands has secured a contract to provide assistance in structured discussions with policymakers to realize the North Sea Wind Power Hub (NSWPH). The Dutch company will provide support services to assist in structuring, initiation, and management of structured discussions with policymak

about 6 years ago
Moray East OSP OTM at Hoboken yard in Belgium
Grid Connection

Moray East’s Third OTM Ready to Go Home

OSP1, the third and final offshore transformer module (OTM) that will be installed at the Moray East offshore wind farm, is ready to leave Belgium this weekend (29 – 30 August). The OTMs, for which Siemens Energy secured a contract in 2018, were fabricated by Smulders and ENGIE Solutions in Hoboken,

about 6 years ago
HKZ Alpha jacket on board the Hua Xing Long vessel arriving in the Netherlands
Grid Connection

HKZ Alpha Jacket Foundation Arrives in Netherlands

The jacket foundation and pin piles for the Hollandse Kust Zuid (HKZ) Alpha platform have arrived from the United Arab Emirates to the Netherlands. According to Petrofac’s post on social media, the 3,200-tonne jacket is currently off the coast of Scheveningen, waiting for Heerema Marine Contractors’

about 6 years ago
Orient Cable Bags Yangjiang Qingzhou III Deal
Grid Connection

Orient Cable Bags Yangjiang Qingzhou III Deal

Ningbo Orient Cable (NBO) has won a contract to provide subsea cables for the Yangjiang Qingzhou III offshore wind farm in China. Under the circa EUR 160 million contract, NBO will provide 75km of 220kV and 142km of 35kV XLPE subsea cables for the 500 MW wind farm. The first batch of cables is expec

about 6 years ago
Boskalis' vessel Ndurance sailed from Norway to Horseshoe Point in Lincolnshire for the cable pull in operation.
Grid Connection

Hornsea Two Connected to Land

Cable pull-in for the Hornsea Two offshore wind farm’s export line has been completed at the project’s landfall site at Lincolnshire’s Horseshoe Point beach. The operation, carried out by Boskalis’ cable laying vessel Ndurance, involved installing 2.4 kilometres of cable under water and toward the c

about 6 years ago
JDR Scoops Moray East Cable Contract
Grid Connection

JDR Scoops Moray East Cable Contract

JDR Cable Systems has secured a contract to provide the termination and testing of 100 inter-array cables and two offshore substation interconnector cables at the Moray East offshore wind farm. Under the contract signed with Boskalis, JDR will perform procedures for the stripping of the armor protec

about 6 years ago
  • 1
  • …
  • 92
  • 93
  • 94
  • …
  • 279