offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Contracts & TendersAuthoritiesR&DWind Farm UpdateBusiness & FinanceTechnologyJobs & Recruitment
An image mapping TenneT's grid connection projects offshore Germany
Grid Connection

TenneT Gathers BorWin5, BorWin6 Offshore Platform Consulting Team

TenneT has awarded several companies and consortia with contracts for consultative engineering and construction services for the offshore transformer stations that will be part of the BorWin5 and BorWin6 offshore grid connections in Germany. A consortium between Fichtner and SeaRenergy will deliver

about 5 years ago
50Hertz-searching-for-Ostwind-3-cable-supplier
Grid Connection

50Hertz Searching for Ostwind 3 Cable Supplier

German offshore transmission system operator (TSO) 50Hertz has issued a tender seeking a provider of the 220 kV submarine and onshore cable system for the Ostwind 3 grid connection. The selected party will be in charge of the design, engineering, construction, installation, handling and commissionin

about 5 years ago
Dutch Studying Eight Potential New Offshore Wind Areas
Grid Connection

Dutch Studying Eight Potential New Offshore Wind Areas

The Netherlands is studying eight new areas off its coast as potential locations where offshore wind farms would be built after 2030. All but one of the eight search zones is expected to have a lower Levelised Cost of Energy (LCoE) compared to the IJmuiden Ver Wind Farm Zone. According to a prelimin

about 5 years ago
Cable Connection Needed for German Offshore Platform
Grid Connection

Cable Connection Needed for German Offshore Platform

Transmission system operator TenneT has issued a notice for a turnkey contract covering the cable system needed to connect the BorWin6 offshore platform to the German grid. With the 930 MW BorWin6 project, TenneT is planning a direct current connection in the North Sea Cluster 7. Scheduled to be com

about 5 years ago
Brayton Point
Grid Connection

Mayflower Wind to Hook Up to Brayton Point

Mayflower Wind and Anbaric Development Partners have signed an agreement for Mayflower Wind to use transmission assets developed by Anbaric to bring offshore wind to Brayton Point, Massachusetts, USA. When fully built out, and with continuing advancements in wind technology, Mayflower Wind’s lease a

about 5 years ago
An image of the Sofia HVDC offshore converter platform
Grid Connection

RWE Contracts RTE International as HVDC Technical Consultant for Sofia OWF

RWE has selected France-based RTE International as the technical consultant for HVDC systems at the 1.4 GW Sofia offshore wind farm in the UK. RTE International will assure the technical quality of the HVDC components for the entire work site. The electricity generated by the offshore wind farm will

about 5 years ago
Dynamic power cables
Grid Connection

DNV and LS Cable & System Jointly Target Nearshore and Floating Wind

DNV has signed a non-exclusive Memorandum of Understanding (MOU) with power cable manufacturer LS Cable & System to target emerging cabling opportunities in the offshore wind industry. The MOU comes in response to growing global demand for high-voltage, next-generation power cables with dynamic capa

about 5 years ago
Transmission charges across the EU
Grid Connection

Transmission Charges a Threat to UK Green Energy Industry – Report

Britain’s energy regulators are putting billions of pounds of green infrastructure investment at risk by overseeing an energy market which favours EU energy imports at the expense of home-grown schemes, new research has shown. Electricity generators in the UK pay transmission charges for the cost of

about 5 years ago
East Anglia Three infographic
Grid Connection

ScottishPower Renewables Selects East Anglia THREE Converter Stations Team

Siemens Energy and Aker Solutions have signed a contract with ScottishPower Renewables with the intention to provide high voltage direct current (HVDC) converter stations for the East Anglia THREE offshore wind project in the UK. The delivery of this EPCI scope for the wind farm’s two converter stat

about 5 years ago
Offshore wind turbines in the sunset.
Grid Connection

USD 30 Billion North Atlantic Offshore Wind Project Launches

Anglo-American joint venture Hecate Independent Power Limited (HIP) has launched its HIP Atlantic Project for installing 10,000 MW of fixed and floating wind turbines in the North Atlantic connected to the UK grid. The long-length, high-capacity, high-voltage direct current (HVDC) transmission cable

about 5 years ago
A photo of a Petrofac worker looking at the Hollandse Kust Beta jacket sailing out
Grid Connection

Petrofac Sends Off Hollandse Kust Zuid Beta Jacket

Petrofac has completed the load out and sail away of the jacket foundation for the Hollandse Kust Zuid (HKZ) Beta platfrom. “Well done to everyone involved. The jacket is now heading to its final destination in the North Sea, where it will then be lifted and positioned in a water depth of approximat

about 5 years ago
A photo of the Borssele Beta offshore transformer platfrom being installed in the North Sea, off the Netherlands
Grid Connection

Poland Working on Offshore Wind Power Transmission Regulation

Poland’s Ministry of Climate and Environment has drafted a regulation on the technical requirements for power transmission from offshore wind farms to the grid on land. On 21 May, the Ministry submitted the draft regulation for inter-ministerial arrangements and public consultations, with the deadli

about 5 years ago
Windpark Fryslân
Grid Connection

All Windpark Fryslân Array Cables In Place

The installation of inter-array cables has been completed at the Windpark Fryslân nearshore wind farm in the IJsselmeer Lake in the Netherlands. The inter-array cables will undergo tests in the coming days, Windpark Fryslân said. The cables connect the wind farm’s 89 Siemens Gamesa 4.3 MW wind turbi

about 5 years ago
A photo of the Saint-Brieuc substation topside move-out at Engie factory in Belgium
Grid Connection

Saint-Brieuc, Neart na Gaoithe OSS Topsides Roll Out

Offshore substation (OSS) topsides for the French Saint-Brieuc and Scottish Neart na Gaoithe offshore wind farms have been moved out of Engie Solutions and HSM Offshore’s factories in Belgium and the Netherlands, respectively. Ailes Marines selected a joint venture between Engie Solutions and Iemant

about 5 years ago
  • 1
  • …
  • 77
  • 78
  • 79
  • …
  • 278