The National Audit Office has highlighted the benefits flowing from the innovative use of competition to award companies licences to transmit electricity from offshore wind farms – but warns that electricity consumers are being left with some significant risks, including bearing the cost of inflatio
The first steel to be used in the construction of DolWin beta was cut at the yard in Dubai yesterday. “DolWin beta is our first wind platform and an important project for Aibel. A lot of people have done a tremendous job in planning and designing the platform. This reflects a good relationship betwe
Statnett and National Grid have signed an agreement to confirm their plans to develop an electricity interconnector between Norway and the UK with a goal to have it operational by 2020. The North Sea Network (NSN) project is a key to further development of the North-European power grid, and of high
Statnett, TenneT and KfW have agreed to develop an electricity interconnector between Germany and Norway with a goal to have it operational by 2018. The project is a key to further development of the North-European power grid, and of high priority to the partners. Statnett is the Norwegian Transmiss
Oceaneering has unveiled an USD 23.5 million (GBP 15.2 million) investment into a new facility at its base in Rosyth, which will allow the company to dive into the offshore renewable energy market, the Scotsman informs. The American-based company plans to construct a larger storage space where it wi
Frédéric Lalanne (48) joins Alstom Grid—the Group’s power transmission sector— as SVP Sales and Marketing. He is a member of the Alstom Grid Management Committee and reports to Alstom Grid President, Grégoire Poux-Guillaume. Frédéric Lalanne holds a master of Sciences & Technology (1988), a post gra
JDR Cable Systems has won its first ever offshore wind farm export wire supply contract. Danish developer Dong has selected the subsea inter-array specialist to manufacture a 12km medium-voltage link for the two-turbine Gunfleet Sands demonstrator. The cable is being produced in JDR’s Hartlepool fac
Centrica Renewables Energy Ltd. has confirmed that Global Marine Energy Ltd., the largest independent provider of subsea power cable installation, maintenance and related engineering services worldwide, has successfully completed its portion of the cable landing and near shore cable works related to
On 4 June 2012 Heerema Fabrication Group in the Netherlands secured a contract for the Engineering, Procurement, Construction and Installation (EPCI) of an HVDC offshore platform for Siemens in Germany on behalf of grid operator TenneT. The contract consists of an offshore platform which will be equ
Intertek’s Energy and Water consultancy services (formerly Intertek METOC), has launched a cable optimisation service to support planning and operation of array, export and interconnector cables. The unique modelling service will enable developers and utilities to save time and cost during array cab
The German government’s plan to improve the storage capacity of the present grid by installing approximately 1,800 kilometres of new, high voltage power lines by 2012 resulted in only 214 kilometres of installed power lines until June 7, writes the cospp.com news portal. After renouncing nuclear pow
ABB, the leading power and automation technology group, is showcasing its capabilities and several innovative technologies for future grid integration of offshore wind power, at the Global Offshore Wind Conference and Exhibition in London, from June 13-14, 2012. ABB is also the core sponsor of the e
Navitus Bay revealed the location for the onshore underground cable route that would transfer the power generated offshore from the proposed Navitus Bay Wind Park into the national grid, providing clean energy for up to 820,000 homes across the UK. The announcement follows a rigorous year-long proce
After many months of manufacturing and preparation, it is now time for the array cable installation to commence on the Anholt project. Over the past year, Nexans Deutschland has been manufacturing array cables for the Anholt Offshore Wind Farm in three different cross sections with a total length of