offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Business & FinanceCablesFixed-BottomOffshore PlatformsOnshore InfrastructureProject UpdatesWind Farm UpdateAuthoritiesPlanning & PermittingContracts & TendersFloating WindSupply ChainInfrastructureOperations & Maintenance
A photo of two wind turbines at the Seagreen 1 offshore wind farm site
Grid Connection

Equitix, Kyuden Group Buy Seagreen 1 Offshore Transmission System

The joint venture between SSE Renewables, TotalEnergies and PTTEP has signed an agreement with a consortium of Equitix and Kyuden Group to sell the offshore transmission assets of the Seagreen Phase 1 offshore wind farm in Scotland. The Seagreen 1 transmission assets transmit electricity from the of

about 1 year ago
BalWin4 first steel
Grid Connection

Fabrication Starts on Germany’s First 2 GW Offshore Grid Connection System

The first steel has been cut for BalWin4, Germany’s first 2 GW offshore grid connection, at Sangsangin Ship Machinery’s factory in South Korea. The fabrication of the foundation for the topside that will later bring renewable energy from the North Sea to Germany has started. According to Daniel Birk

about 1 year ago
Installation of Final Inter-Array Cables About to Start at Îles d’Yeu and Noirmoutier Project Site
Grid Connection

Installation of Final Inter-Array Cables About to Start at Îles d’Yeu and Noirmoutier Project Site

Louis Dreyfus TravOcean and Prysmian will soon resume the inter-array cable installation at the Îles d’Yeu and Noirmoutier offshore wind farm site in France. According to a recent social media post from Louis Dreyfus TravOcean, 5 strings and 37 cables are left to be installed and connected at the si

about 1 year ago
Inch Cape Offshore Construction to Start in April
Grid Connection

Inch Cape Offshore Construction to Start in April

Construction activities on the Scottish Inch Cape offshore wind farm are scheduled to start this April with construction work within the project’s export cable corridor. According to a Notice to Mariners from the project team, the work will commence with operations at the export cable landfall site

about 1 year ago
RWE Sofia substation
Grid Connection

Ofgem Opens Tender for RWE’s Sofia Offshore Wind Farm Transmission Links

Ofgem is inviting tenders to own and operate electricity transmission links worth GBP 4 billion (about EUR 4.8 billion), connecting the Sofia offshore wind farm to Great Britain’s mainland energy network. Ofgem has opened the Offshore Transmission Owner (OFTO) regime Tender Round 12, which invites i

about 1 year ago
Geophysical Survey Underway at Inch Cape Offshore Wind Farm Site
Grid Connection

Geophysical Survey Underway at Inch Cape Offshore Wind Farm Site

Geophysical survey operations and a static fishing gear survey are taking place within the Inch Cape offshore wind farm site and its associated export cable corridor from 19 February until the end of April. On behalf of Inch Cape Offshore Limited, a joint venture between ESB and Red Rock Renewables,

about 1 year ago
Siemens Energy grid connection
Grid Connection

Siemens Energy Selects Pfisterer Cable Systems for German Offshore Grid Connection Projects

Siemens Energy has selected the German company Pfisterer for the supply of turnkey cable systems for the BorWin4 and DolWin4 offshore grid connections in the North Sea. Pfisterer is in charge of implementing the entire 66 kV AC cable infrastructure between the gas-insulated switchgear (GIS) transfor

about 1 year ago
A bp facility with the company's logo
Grid Connection

BP Withdraws Beacon Wind Transmission Application

BP has withdrawn the application for the transmission system that would connect its Beacon Wind offshore wind project, planned to be built off New York, to the grid on land. The application, submitted in 2022, concerns the transmission infrastructure that was planned to run from the boundary of New

about 1 year ago
An aerial photo of the Kriegers Flak offshore wind farm
Grid Connection

Intertek Completes Risk Assessment for Five Danish Offshore Wind Export Cables

Quality assurance provider Intertek, on behalf of the Danish transmission system operator Energinet, has carried out a risk assessment for five export cables that will be part of offshore wind farms planned to be built in the Danish sectors of the North and Baltic Seas. The export cables that were t

about 1 year ago
UK End of UK-Netherlands Interconnector Planned to Land in Walberswick
Grid Connection

UK End of UK-Netherlands Interconnector Planned to Land in Walberswick

The LionLink interconnector, a subsea cable that will connect the future Nederwiek 3 offshore wind farm in the Netherlands to the UK grid and interconnect the two national power networks, is planned to make landfall in Walberswick on its UK side. On 19 February, National Grid Ventures (NGV) said it

about 1 year ago
Balmoral Comtec Enters Agreement for Korea’s 750 MW Floating Wind Project
Grid Connection

Balmoral Comtec Enters Agreement for Korea’s 750 MW Floating Wind Project

Balmoral Comtec, part of Balmoral Group, has signed a memorandum of understanding (MoU) with LS Cable & System and LS Marine Solution to collaborate in the floating offshore wind sector and on the 750 MW Bandibuli/Firefly project in South Korea. The agreement with the Scotland-based buoyancy, protec

about 1 year ago
An aerial photo of the Dudgeon Offshore Wind Farm in the UK
Grid Connection

New York Greenlights Equinor’s Empire Wind 1 Transmission Facilities

Equinor has been granted approval by the New York State Public Service Commission (NYPSC) to build and operate offshore and onshore transmission facilities for the 816 MW Empire Wind 1 offshore wind project. The overall transmission line for the Empire Wind 1 offshore wind project runs approximately

about 1 year ago
Dragados TenneT
Grid Connection

Dragados Grows Capacity in Spain for TenneT’s German Offshore Converter Stations

Dragados Offshore is planning to add a new production site with 400,000 square metres of space in Spain for the manufacturing of TenneT’s 2 GW offshore converter stations. The production site is currently being built in the southern Spanish coastal town of Algeciras (Campo de Gibraltar region). From

about 1 year ago
Chantiers de l’Atlantique Subsidiary Wins French Offshore Substation Maintenance Job
Grid Connection

Chantiers de l’Atlantique Subsidiary Wins French Offshore Substation Maintenance Job

Chantiers de l’Atlantique subsidiary, Atlantique Offshore Energy, has been awarded contracts to carry out preventive maintenance of the two electrical substations for the 488 MW Îles d’Yeu and Noirmoutier and the 496 MW Dieppe Le Tréport offshore wind projects in France. The company has been chosen

about 1 year ago
  • 1
  • …
  • 22
  • 23
  • 24
  • …
  • 278