Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
R&DAuthoritiesWind Farm UpdateBusiness & FinanceOperations & MaintenanceTechnologyEnvironment
EMEC Makes New Animations for Wave and Tidal Test Sites
Grid Connection

EMEC Makes New Animations for Wave and Tidal Test Sites

EMEC offers a range of ready-made and cost-minimising test and demonstration facilities in major wave and tidal resources. Significant infrastructure investments have been made to make it as easy as possible for technology developers to learn by doing, with full confidentiality of performance data.

about 12 years ago
Germany to Allot Available Grid Connection Capacity
Grid Connection

Germany to Allot Available Grid Connection Capacity

German Federal Network Agency launched a new initiative to allocate the 1,722.7MW grid connection capacity for the offshore wind developers. The available capacity will allow the country to reach its offshore wind goal of 7.7 GW by 2020. According to the agency, interested parties have until 1 Octob

about 12 years ago
DOE Issues National Offshore Wind Energy Grid Interconnection Study
Grid Connection

DOE Issues National Offshore Wind Energy Grid Interconnection Study

The U.S. Energy Department (DOE) has released the first National Offshore Wind Energy Grid Interconnection Study(NOWEGIS). The NOWEGIS investigated the key economic and technological factors that will influence the integration of offshore wind energy onto the national grid. NOWEGIS suggests that the

about 12 years ago
Onshore Work on Dutch Wind Farm Substation Commences
Grid Connection

Onshore Work on Dutch Wind Farm Substation Commences

The onshore preparations for the new 129 MW Eneco Luchterduinen, a partnership of Eneco and Mitsubishi Corporation, offshore wind farm have entered a new stage. Pre-fabricated sub-modules for the Offshore High Voltage Substation (OHVS) have now been transported to the yard of Fabricom in Antwerp, Be

about 12 years ago
Siemens Signs Electrical System Infrastructure Deal for Dudgeon OWF
Grid Connection

Siemens Signs Electrical System Infrastructure Deal for Dudgeon OWF

Dudgeon Offshore Wind Limited has awarded the contract for the Electrical System Infrastructure for its Dudgeon Offshore Wind Farm to Siemens Transmission and Distribution Ltd. The contract covers engineering, procurement, construction and offshore hook-up of one onshore substation and one offshore

about 12 years ago
Half of Gwynt y Môr Generating Power
Grid Connection

Half of Gwynt y Môr Generating Power

More than half of the 160 turbines at RWE Innogy UK’s flagship offshore wind farm, Gwynt y Môr, off the North Wales coast, have been commissioned and are generating electricity. The milestone was reached last week with the 81st turbine connected to the National Grid. Construction of the world’s se

about 12 years ago
Greater Gabbard OWF’s Cabling Infrastructure Worries Local Fishermen
Grid Connection

Greater Gabbard OWF’s Cabling Infrastructure Worries Local Fishermen

The developers of the Greater Gabbard offshore wind farm, which is fully operational since 2012, are meeting with local fishermen in Lowestoft today to discuss possible solutions to the issues reported by the fishermen. Fishermen that operate in the Greater Gabbard area are having problems with the

about 12 years ago
DolWin Beta Becomes Resident of North Sea (Gallery)
Grid Connection

DolWin Beta Becomes Resident of North Sea (Gallery)

DolWin beta, the offshore HVDC platform that will connect three offshore wind farms in the German part of the North Sea, is now anchored and ballasted to the seabed, Aibel has announced on its social media pages. The operation of moving the platform to its fixed position at sea started on Saturday e

about 12 years ago
6 Alpha Associates Issues Gwynt y Mor Cable Clearance Certificates
Grid Connection

6 Alpha Associates Issues Gwynt y Mor Cable Clearance Certificates

6 Alpha Associates, the strategic advisor for managing specialist risks, has completed a comprehensive, five-month Unexploded Ordnance (UXO) risk management project and as a direct result, has issued final cable UXO clearance certificates to Gwynt y Môr Offshore Wind Farm, a 160- turbine project loc

about 12 years ago
JDR Scores Dudgeon Cabling Deal
Grid Connection

JDR Scores Dudgeon Cabling Deal

JDR, a provider of technology connecting the global offshore energy industry, has won a new contract with VBMS for the Statoil/Statkraft Dudgeon offshore wind farm. Dudgeon, off the UK’s Norfolk coast will utilise over 95 kilometres of JDR’s copper core inter-array cable and a range of cable accesso

about 12 years ago
OMM Demonstrates Its New ‘Tower Support Services’ Package
Grid Connection

OMM Demonstrates Its New ‘Tower Support Services’ Package

Offshore Marine Management (OMM) has successfully completed six of eleven cable pull-in operations under its new ‘Tower Support Services’ package. The package, which was formed to provide clients with a clearly defined set of support services, also includes hang-off as well as termination and testin

about 12 years ago
Cable Issue to Take Riffgat Off Grid
Grid Connection

Cable Issue to Take Riffgat Off Grid

EWE will have to make an unscheduled shutdown of its 108MW Riffgat offshore wind farm in September. A cable connecting the wind farm to the grid was affected during the work on Dolwin converter station, and, according to TenneT, the cable will need to be stabilised. Given that the cable did not suff

about 12 years ago
TenneT Eyes UXOs on BorWin3 Cable Route
Grid Connection

TenneT Eyes UXOs on BorWin3 Cable Route

Grid operator in Germany, TenneT, is seeking contractor to conduct an unexploded explosive ordnance (UXO) survey, identification and removal on the cable route BorWin3 in the German sector of the North Sea. The planned BorWin3 submarine cable connection is a DC power transmission link with a length

about 12 years ago
Fundy FORCE Works on Its Onshore Electrical Infrastructure
Grid Connection

Fundy FORCE Works on Its Onshore Electrical Infrastructure

After Fundy Ocean Research Center for Energy (FORCE) published a photo of ongoing works on an onshore electrical infrastructure, Offshore WIND contacted the Center to find out more about this phase of the project. The photo shows the installation of the last cable vaults, which will house the shore

about 12 years ago
  • 1
  • …
  • 221
  • 222
  • 223
  • …
  • 279