Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Business & FinanceContracts & TendersOperations & MaintenanceVesselsWind Farm UpdateTechnologyEnvironmentR&DAuthoritiesTraining & Education
Energinet.dk Issues Kriegers Flak CTV Call
Grid Connection

Energinet.dk Issues Kriegers Flak CTV Call

Danish transmission system operator Energinet.dk is looking for a provider of manned crew transfer vessels (CTVs) for the transportation of service crews between the harbors of Klintholm/Rødsand and the Kriegers Flak platforms KFA and KFB in the Baltic Sea.

about 9 years ago
WSP | PB to Keep an Eye On North Sea Link Cables
Grid Connection

WSP | PB to Keep an Eye On North Sea Link Cables

Engineering consultancy WSP | Parsons Brinckerhoff has been appointed by National Grid North Sea Link Ltd to provide cable manufacturing quality and inspection services on the 1.4GW North Sea Link interconnector, the first electricity link between Nordic and British markets.

about 9 years ago
Thomson on Hornsea Project Three Ecology Survey Duty
Grid Connection

Thomson on Hornsea Project Three Ecology Survey Duty

UK-based ecology consultancy Thomson Ecology has been contracted by DONG Energy to undertake the Phase 2 ecological surveys to inform the 2.4GW Hornsea Project Three offshore wind farm onshore cable route Environmental Statement.

about 9 years ago
Report: Renewables Key to Decarbonising Energy System by 2060
Grid Connection

Report: Renewables Key to Decarbonising Energy System by 2060

80% of power generation and 65% of total primary energy supply should come from renewables if global energy-related carbon dioxide (CO2) emissions are to be reduced by 70% by 2050 and completely phased-out by 2060, according to new findings released by the International Renewable Energy Agency (IREN

about 9 years ago
Walney 3 Substation Heads to the Irish Sea
Grid Connection

Walney 3 Substation Heads to the Irish Sea

The Engie Fabricom and Iemants consortium has shipped the first of two offshore substations built for DONG Energy’s 660MW Walney Extension offshore wind farm in the Irish Sea from the construction yard in Hoboken, Belgium.

about 9 years ago
APEM Helps Vattenfall Pinpoint Onshore Cable Route for Norfolk Wind Farms
Grid Connection

APEM Helps Vattenfall Pinpoint Onshore Cable Route for Norfolk Wind Farms

APEM has undertaken an aerial survey to assist Vattenfall in identifying an onshore cable corridor for the 1.8GW Norfolk Vanguard and the 1.8GW Norfolk Boreas offshore wind farms.

about 9 years ago
Siem Clears Caithness-Moray Subsea Route
Grid Connection

Siem Clears Caithness-Moray Subsea Route

Siem Offshore’s Anchor Handling Tug Supply Vessel (AHTS) Siem Ruby has cleared rocks and boulders along the proposed subsea cable route for the 1.2GW Caithness-Moray transmission project in Scotland.

about 9 years ago
Ofgem Opens Tenders for Galloper and Walney Extension Links
Grid Connection

Ofgem Opens Tenders for Galloper and Walney Extension Links

UK’s energy market regulator Ofgem has invited companies to submit bids to own and run links to the 336MW Galloper and the 660MW Walney Extension offshore wind farm.

about 9 years ago
Top News of the Week, 6 – 12 March 2017
Grid Connection

Top News of the Week, 6 – 12 March 2017

Artificial North Sea Island Plan Moves Ahead TenneT Netherlands, Energinet.dk and TenneT Germany will sign a trilateral agreement on developing the North Sea Wind Power Hub project during the North Seas Energy Forum in Brussels on 23 March, in the presence of Maroš Šefčovič, European Commissioner fo

about 9 years ago
Galloper Crew Enters Final Stretch at Sizewell Beach
Grid Connection

Galloper Crew Enters Final Stretch at Sizewell Beach

The final phase of Galloper construction work at Sizewell beach in Suffolk is about to get underway, according to Galloper Wind Farm Limited (GWFL), the developer of the 336MW offshore wind project.

about 9 years ago
First Walney Extension Substation Loaded Out in Hoboken
Grid Connection

First Walney Extension Substation Loaded Out in Hoboken

The load-out of the first of two substations built by the Engie Fabricom-Iemants consortium for DONG Energy’s 660MW Walney Extension offshore wind farm took place in Hoboken, Belgium, on Thursday, 9 March. The topside was removed from its base on the production site and put on the pontoon. The topsi

about 9 years ago
Prysmian Scores North Sea Offshore Wind Brace
Grid Connection

Prysmian Scores North Sea Offshore Wind Brace

Italy-based cable manufacturer to deliver inter-array cable systems for the 400MW Merkur and the 407MW Horns Rev 3 offshore wind farm

about 9 years ago
ZTT to Link EnBW Hohe See OWF to BorWin3
Grid Connection

ZTT to Link EnBW Hohe See OWF to BorWin3

Transmission System Operator TenneT has awarded the Chinese power cables manufacturer ZTT with a contract to supply and construct a 155kV HVAC grid connection between the 497MW EnBW Hohe See offshore wind farm and the 900MW BorWin3 DC grid connection system in the North Sea.

about 9 years ago
Fugro Completes Viking Link Seabed Survey
Grid Connection

Fugro Completes Viking Link Seabed Survey

Fugro has completed a seabed survey for the Viking Link, one of the longest DC electricity interconnectors that will link the UK and Danish electricity transmission systems. The Viking Link, a joint venture between the UK’s National Grid and Denmark’s Energinet, is a proposed 1,400-megawatt high vol

about 9 years ago
  • 1
  • …
  • 161
  • 162
  • 163
  • …
  • 279