The Paris office of LOC Renewables, a part of LOC Group has been contracted by the Belgian transmission system operator Elia to provide Marine Warranty Survey (MWS) services for the Modular Offshore Grid (MOG) project.
The Scottish government has called-in Inch Cape Offshore Limited’s application for planning permission in principle for onshore components of the wind farm development.
TenneT TSO has issued a contract notice for the design, supply, erection and testing of complete 220kV and 380kV filter banks (H-bridge capacitor banks including air-core reactors and resistors), for the operator’s high voltage grid in the Netherlands.
Ørsted and Balfour Beatty have broken ground on the onshore substation for the Hornsea Project Two offshore wind farm. Balfour Beatty is in charge of enabling works for the wind farm’s onshore substation to ensure the site preparation is underway in good time, avoiding future schedule pressures, a s
The Carbon Trust-led Floating Wind Joint Industry Partnership has kicked off two new studies to investigate critical issues for large-scale floating wind farms.
The Hornsea Project One offshore substation topside Z12 has been loaded onto a barge and is awaiting sail out to the installation site some 120 kilometres off Yorkshire, UK.
Denmark’s Energinet and the UK’s National Grid have postponed the final investment decision (FID) on the Viking Link interconnector project, which was initially scheduled to take place in March.
The jack-up vessel Seajacks Hydra will arrive on the Beatrice site this week and connect to OTM 1, the first of the two Siemens Offshore Transformer Modules that the wind farm will feature, to provide accommodation facilities during its commissioning.
Seaway Heavy Lifting’s crane vessel Oleg Strashnow has installed the offshore substation topside on the 385MW Arkona offshore wind farm in the German Baltic Sea.
Danish Energinet and UK-based National Grid have awarded Intertek with a contract to provide unexploded ordnance (UXO) client representative services on the Viking Link interconnector project.
N-Sea Survey BV has won a contract to provide unexploded ordnance (UXO) survey and inspection services for the Viking Link HVDC interconnector between Denmark and the United Kingdom.
Nexans has completed the manufacturing of the 220kV offshore export cable for the Beatrice wind farm, with the final section now en route to the offshore site in the Outer Moray Firth, Scotland.
Energinet has resumed onshore cable installation works for the Kriegers Flak offshore wind farm after the winter break, and is now ready to start with the final stage of cable excavation on land.
Ørsted’s Greater Changhua offshore wind projects in Taiwan are in the contracting process of TWD 3 billion (approximately EUR 83.6 million) onshore substation EPC (engineering, procurement, and construction) contract, the Danish company said.