offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Contracts & TendersAuthoritiesEnvironmentWind Farm UpdateBusiness & FinanceOperations & MaintenanceR&DTechnologyPorts & LogisticsVessels
LOC Renewables on MOG Marine Warranty Survey Duty
Grid Connection

LOC Renewables on MOG Marine Warranty Survey Duty

The Paris office of LOC Renewables, a part of LOC Group has been contracted by the Belgian transmission system operator Elia to provide Marine Warranty Survey (MWS) services for the Modular Offshore Grid (MOG) project.

about 8 years ago
Scots ‘Call-in’ Inch Cape Onshore Planning Application
Grid Connection

Scots ‘Call-in’ Inch Cape Onshore Planning Application

The Scottish government has called-in Inch Cape Offshore Limited’s application for planning permission in principle for onshore components of the wind farm development.

about 8 years ago
TenneT On The Lookout For Filter Banks
Grid Connection

TenneT On The Lookout For Filter Banks

TenneT TSO has issued a contract notice for the design, supply, erection and testing of complete 220kV and 380kV filter banks (H-bridge capacitor banks including air-core reactors and resistors), for the operator’s high voltage grid in the Netherlands.

about 8 years ago
Hornsea Two Onshore Substation Works Underway
Grid Connection

Hornsea Two Onshore Substation Works Underway

Ørsted and Balfour Beatty have broken ground on the onshore substation for the Hornsea Project Two offshore wind farm. Balfour Beatty is in charge of enabling works for the wind farm’s onshore substation to ensure the site preparation is underway in good time, avoiding future schedule pressures, a s

about 8 years ago
Floating Wind Partners Launch New Projects
Grid Connection

Floating Wind Partners Launch New Projects

The Carbon Trust-led Floating Wind Joint Industry Partnership has kicked off two new studies to investigate critical issues for large-scale floating wind farms.

about 8 years ago
First Hornsea One OSS Topside Hits the Water
Grid Connection

First Hornsea One OSS Topside Hits the Water

The Hornsea Project One offshore substation topside Z12 has been loaded onto a barge and is awaiting sail out to the installation site some 120 kilometres off Yorkshire, UK.

about 8 years ago
Viking Link Hits a Roadblock
Grid Connection

Viking Link Hits a Roadblock

Denmark’s Energinet and the UK’s National Grid have postponed the final investment decision (FID) on the Viking Link interconnector project, which was initially scheduled to take place in March.

about 8 years ago
Seajacks Hydra to Help Out with Beatrice OTM Commissioning
Grid Connection

Seajacks Hydra to Help Out with Beatrice OTM Commissioning

The jack-up vessel Seajacks Hydra will arrive on the Beatrice site this week and connect to OTM 1, the first of the two Siemens Offshore Transformer Modules that the wind farm will feature, to provide accommodation facilities during its commissioning.

about 8 years ago
Arkona Offshore Substation Stands Tall
Grid Connection

Arkona Offshore Substation Stands Tall

Seaway Heavy Lifting’s crane vessel Oleg Strashnow has installed the offshore substation topside on the 385MW Arkona offshore wind farm in the German Baltic Sea.

about 8 years ago
Intertek on Viking Link Duty
Grid Connection

Intertek on Viking Link Duty

Danish Energinet and UK-based National Grid have awarded Intertek with a contract to provide unexploded ordnance (UXO) client representative services on the Viking Link interconnector project.

about 8 years ago
N-Sea Wins Viking Link UXO Contract
Grid Connection

N-Sea Wins Viking Link UXO Contract

N-Sea Survey BV has won a contract to provide unexploded ordnance (UXO) survey and inspection services for the Viking Link HVDC interconnector between Denmark and the United Kingdom.

about 8 years ago
Nexans Sends Off Last Beatrice Export Cable Section (VIDEO)
Grid Connection

Nexans Sends Off Last Beatrice Export Cable Section (VIDEO)

Nexans has completed the manufacturing of the 220kV offshore export cable for the Beatrice wind farm, with the final section now en route to the offshore site in the Outer Moray Firth, Scotland.

about 8 years ago
Energinet Resumes Kriegers Flak Onshore Cabling Works After Winter Break
Grid Connection

Energinet Resumes Kriegers Flak Onshore Cabling Works After Winter Break

Energinet has resumed onshore cable installation works for the Kriegers Flak offshore wind farm after the winter break, and is now ready to start with the final stage of cable excavation on land.

about 8 years ago
Ørsted Enters Final Onshore Substation Contract Talks in Taiwan
Grid Connection

Ørsted Enters Final Onshore Substation Contract Talks in Taiwan

Ørsted’s Greater Changhua offshore wind projects in Taiwan are in the contracting process of TWD 3 billion (approximately EUR 83.6 million) onshore substation EPC (engineering, procurement, and construction) contract, the Danish company said.

about 8 years ago
  • 1
  • …
  • 136
  • 137
  • 138
  • …
  • 278