Work on the jacket foundation for the 700MW Borssele Alpha offshore transformer station is in full swing at HSM Offshore’s yard in Schiedam, the Netherlands, as this photo shared by Ørsted shows.
The jacket foundation for the 900MW BorWin3 offshore grid platform has been installed in the North Sea, nearly 130 kilometres off the German coast, Petrofac said.
HSM Offshore has started the load-out of the offshore substation topside built for the Borkum Riffgrund 2 offshore wind farm at its yard in Schiedam, the Netherlands.
The jacket foundation for the Hohe See offshore substation has been loaded out at Smulders’ yard in Vlissingen, the Netherlands.
EWE Offshore Service & Solutions GmbH (EWE OSS) has won a contract to provide technical maintenance of the Merkur offshore substation in the German North Sea.
Ideol Offshore and STX Europe Offshore Energy are developing a floating substation design for use on bottom-fixed and floating offshore wind farms starting at depths of 30 metres.
Arcadis and Pondera Consult will carry out a strategic study into the various possibilities to transport the energy from future large-scale offshore wind farms in the Dutch North Sea to the national grid.
Nexans has completed all export cable installation and burial works at the Beatrice site, where Siemens Transmission and Distribution team has started commissioning works on the recently installed second Offshore Transformer Module (OTM) in preparation for the energisation of the system.
Petrofac has secured a five-year framework agreement with Transmission Capital to provide engineering services across six of its Offshore Transmission Owner (OFTO) assets.
The jacket foundation for TenneT’s 900MW BorWin3 HVDC platform has been installed in the German North Sea.
EDS HV Group has completed the onshore installation, termination and testing work of the platform cable on the EnBW Hohe See offshore wind project.
Power cable services provider CWind has signed a five-year cable repair framework agreement with Transmission Capital Partners (TCP).
Denmark’s minister of Energy, Utilities and Climate Lars Christian Lilleholt has officially inaugurated the 28MW Nissum Bredning demonstration offshore wind farm.
Although the Rampion offshore wind farm is at a stage of looking at full commissioning, the project site recently saw boulder clearance and UXO identification works starting along one of its export cable routes, since the Rampion team has been replacing the initially installed export cables after id