Seaway Heavy Lifting’s Oleg Strashnov has started installing the jacket foundation for Elia’s Offshore Switchyard Platform (OSY) in the Belgian North Sea.
Britain’s total capacity available from renewables has overtaken fossil fuels for the first time, according to the latest Drax Electric Insights report.
Ørsted has awarded an engineering, procurement, and construction (EPC) contract to Taiwan Cogeneration Corporation (TCC) to build two onshore substations, cable corridors, landfalls and transition joint bays for the first 900MW Greater Changhua projects.
Moray Offshore Windfarm (East) Limited and NKT have signed a final binding agreement for the delivery and installation of export cable systems on the 950MW Moray East offshore wind farm.
Jack Up Barge (JUB) has completed a support and supply contract for the hook-up and commissioning of two offshore platforms at the Kriegers Flak offshore wind farm in the Danish Baltic Sea.
Singapore-based Sembcorp Marine has signed an agreement with Ørsted’s subsidiary Optimus Wind Limited for engineering, procurement, construction, hook-up and commissioning works on two substation topsides, to be deployed at the Hornsea 2 offshore wind farm.
Smulders, acting for and on behalf of the JV Iemants-Eiffage, has rolled out the substation topside for the Deutsche Bucht offshore wind farm at the yard of Damen Shiprepair Vlissingen. The milestone was achieved 10 months after starting the final assembly in January 2018. The topside was driven out
Ørsted has added Bladt Industries, Nexans and Cordeel to the list of suppliers and contractors for the 752MW Borssele 1 and 2 wind farm in the Dutch North Sea, according to Henrik Egholm, EPC director Borssele 1 and 2.
Heerema Fabrication Group (HFG) has loaded the jacket foundation for Elia’s Offshore SwitchYard (OSY) platform onto a barge at the Vlissingen yard.
The Netherlands could have its first multifunctional energy island ready by 2025, Ernst van Zuijlen, Project Director at Offshore Service Facilities, said at the Offshore WIND Conference in Amsterdam.
The Barnstable Town Council voted unanimously to approve a transmission cable at Covell’s Beach that will connect the 800MW Vineyard Wind offshore wind farm with the regional electric power grid.
There are no local content requirements in offshore wind tenders in the Netherlands because the Dutch government sees competition as key to achieving cost reductions, Ruud de Bruijne, Project Manager Offshore Wind Energy at the Netherlands Enterprise Agency (RVO.nl) said during the Offshore WIND Con
Offshore wind farms in combination with meshed offshore grids and cross-border interconnectors, powered by appropriate regulatory frameworks, can largely contribute to energy security in the European Union.
Lancashire-based VolkerInfra has signed a multi-million-pound contract with Ørsted to install 360 kilometres of high voltage onshore cables for the 1.4GW Hornsea 2 offshore wind farm.