Partners Group has provided equity financing for the 500MW Greenlink Interconnector, the subsea connection set to be built between Ireland and Great Britain. Greenlink has so far been developed by Element Power, which, together with funds managed by Hudson Sustainable Investments, is the other major
EDS HV Group has completed the connection and testing during a planned outage at the Greater Gabbard offshore wind farm in the UK. EDS was in charge of re-connecting and testing the inter-array cable on the IG substation during the planned outage. The company said it worked with four contractors, wh
The King of the Netherlands Willem-Alexander and Queen Máxima have reviewed the concept and plans for the North Sea Wind Power Hub (NSWPH) as part of the German-Dutch trade delegation meeting. At the meeting, held on 6 March in Bremerhaven, TenneT CEO Manon van Beek presented the vision and current
Sparrows Group Cable and Pipe Lay Solutions (CPLS) division has delivered its largest renewables project through three contracts related to the 1.2GW Hornsea Project One offshore wind farm. The three contracts were awarded through Boskalis (formerly VBMS), DEME Offshore (formerly known as Tideway),
TELE-FONIKA Kable (TFKable) has conducted the first Factory Acceptance Test (FAT) of a 220kV onshore high-voltage cable for the UK’s Moray East offshore wind farm at its Bydgoszcz plant in Poland. The cable supplier informed via social media that it had successfully FAT-tested 1,600mm² and 2,000mm²
Cable laying vessel Cable Enterprise has arrived at Prysmian Group’s factory in Pikkala, Finland, to load the first batch of cables for the IFA2 (Interconnexion France-Angleterre) interconnector project. Over a ten-day period, over 100 kilometres of ± 320 kV DC submarine cables will be loaded onto t
The 370MW Norther offshore wind farm has delivered first power to the Belgian grid. The project’s first four MHI Vestas 8.4MW turbines were connected to Stevin, Elia’s new high-voltage station in Zeebrugge today, 26 February. Half of the generated wind energy will be sold to Engie and the remaining
The Scottish Government has approved the onshore planning application for the Inch Cape offshore wind project. Inch Cape Offshore Ltd (ICOL) submitted the planning application in principle to East Lothian Council in March last year proposing the former Cockenzie Power Station site as the new locatio
UK-based Correll Services Ltd has secured a contract to provide subsea and land cable termination and testing works on the Formosa 1 Phase 2 offshore wind farm in Taiwan. The contract has been awarded by Formosa 1 project turnkey contractor Jan De Nul Group. Correll Services – a specialist in high v
The Belgium-based Marlinks has secured a contract for monitoring the cable burial depth of the Northwester 2 offshore wind farm. Marlinks will monitor the burial depth of six inter-array cables and one export cable, which will be equipped by the company’s distributed temperature sensing (DTS) measur
Ørsted and Eversource Energy signed a Memorandum of Understanding with Con Edison Transmission to support the development of the transmission facilities needed to deliver the energy produced by the proposed Sunrise Wind offshore wind farm to the New York grid. The MoU also gives New York’s transmiss
The TFKable Group has produced the first part of the 220kV onshore high-voltage cable for the Moray East offshore wind farm in the UK. According to the company, the 220kV cable is now ready to be delivered from its Bydgoszcz plant in Poland for the 950MW offshore wind project. TFKable and VolkerInfr
The European Commission has approved, under the EU Merger Regulation, the acquisition of joint control over Diamond Transmission Partners by Diamond Transmission Corporation Limited (DTC) and by Infrared Capital Partners Limited (IRCP). Diamond Transmission Partners is the holding company of the Off
German transmission system operators (TSOs) have issued the first draft of the Grid Development Plan (GDP) 2030, which includes expanded offshore wind capacity scenarios. According to 50Hertz, Amprion, TenneT and TransnetBW, the expansion targets have been increased to 17GW in scenarios B and C 2030