Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
AuthoritiesContracts & TendersWind Farm Update
US Offshore Wind Farm Sets USD 58.47/MWh Electricity Price
Grid Connection

US Offshore Wind Farm Sets USD 58.47/MWh Electricity Price

The Department of Energy Resources (DOER) has subsequently submitted a filing letter requesting that DPU approve the 20-year contracts with Eversource, National Grid, and Unitil.

about 6 years ago
ISC and WSP Join Mayflower Wind Offshore Substation Roster
Grid Connection

ISC and WSP Join Mayflower Wind Offshore Substation Roster

As a sub-contractor to Bladt Industries, ISC will perform the engineering design works together with Semco Maritime and the US partner WSP.

about 6 years ago
TenneT Seeks Representative During 525 kV Cable Tests
Grid Connection

TenneT Seeks Representative During 525 kV Cable Tests

TenneT TSO B.V. has issued a tender call for technical inspection services during the testing of a 525 kV High Voltage Direct Current (HVDC) cable system. TenneT plans to develop 2GW offshore grid connection systems to integrate offshore wind farms into the Dutch and into the German power grid. To b

about 6 years ago
Map showing interconnection line between UK and Belgium
Grid Connection

Nemo Link Marks One Year of Operation

Nemo Link, the interconnector between UK and Belgium, is celebrating its first year of operation. On this occasion, the project partners National Grid and Elia have reported the interconnector’s “outstanding performance figures.”

about 6 years ago
Orient Cable Receives Order from China Three Gorges
Grid Connection

Orient Cable Receives Offshore Wind Order from China Three Gorges

Orient Cable has received a letter of award from China Three Gorges New Energy (CTG) to supply cables for the Guangdong Yangjiang Shaba-West (Phase II) offshore wind project in China.

about 6 years ago
Combined Grid Solution Converter Ready For Energization
Grid Connection

Combined Grid Solution Converter Ready For Energization

The converter for 50Hertz and Energinet’s Combined Grid Solution interconnector in the Baltic Sea is ready for energization. The energization will include all converter components as well as the expansion in the substation in Bentwisch, and control technology, 50Hertz said. Developed by Denmark’s En

about 6 years ago
Ofgem Starts Western Link Probe
Grid Connection

Ofgem Starts Western Link Probe

Ofgem has launched an investigation into National Grid and Scottish Power Transmission for the delivery and ongoing operation of the Western Link high-voltage direct current subsea cable.

about 6 years ago
TenneT Awards Inspection Contract to Lloyd’s Register
Grid Connection

TenneT Awards Inspection Contract to Lloyd’s Register

The five-year contract includes services on the TenneT FAST project (Framework Agreement for Site Supervision at Yards for TenneT) such as detailed site supervision and vendor assurance and performance during the construction and commissioning of the platforms.

about 6 years ago
German Operating Offshore Wind Capacity Tops 7.5GW Mark
Grid Connection

German Operating Offshore Wind Capacity Tops 7.5GW Mark

The representatives have once again urged the federal government to increase the 2030 offshore wind expansion target to at least 20GW, and to establish an expansion strategy beyond that.

about 6 years ago
Heinrich Hirdes to Keep Baltic 1 and 2 Cables Covered
Grid Connection

Heinrich Hirdes to Keep Baltic 1 and 2 Cables Covered

German transmission system operator (TSO) 50Hertz has awarded Heinrich Hirdes GmbH, a subsidiary of Boskalis, with a contract to provide backfilling of the subsea cable routes on the Baltic 1 and Baltic 2 grid connections. The services relate to the entire project period. In designated areas along t

about 6 years ago
Tekmar Kit for Kriegers Flak
Grid Connection

Tekmar Kit for Kriegers Flak

Tekmar Energy Limited has secured contract awards from Global Marine Group and JDR Cables for the supply of TekLink® cable protection systems and cable hang-off assemblies for the Kriegers Flak offshore wind farm. Global Marine Group has contracted Tekmar Energy to supply 150 patented TekLink® Mecha

about 6 years ago
VLCV BV Finishes Borssele Cable Gig
Grid Connection

VLCV BV Finishes Borssele Cable Gig

VLCV BV has completed the installation of two ducts, including bellmouths, for the cable system of the Borssele offshore wind project in the Netherlands. VLCV used the direct drill technique which consists of an onshore prefabricated pipeline that is directly connected with a drill head and installs

about 6 years ago
ZTT Picks Borealis HVDC Tech for Chinese Offshore Wind Project
Grid Connection

ZTT Picks Borealis HVDC Tech for Chinese Offshore Wind Project

ZTT International has selected Borealis to provide HVDC insulation and semi-conductor technology for the Rudong Jiangsu offshore wind project in China. Borealis will provide its Borlink LS4258DCE insulation compound and LE0550DC semiconductor for the cables that will be able to transport 400kV of en

about 6 years ago
Mayflower Wind Inter-Array Cables Coming from Greece
Grid Connection

Hellenic Cables Wins Mayflower Wind Inter-Array Cable Contract

Hellenic Cables has secured a contract to supply inter-array cables for the Mayflower Wind project off the coast of Massachusetts, U.S. Under the agreement with Semco Maritime, Hellenic Cables is in charge of the design, supply and storage of circa 300km of 66kV, XLPE insulated submarine inter-array

about 6 years ago
  • 1
  • …
  • 104
  • 105
  • 106
  • …
  • 279