offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Fixed-Bottom

Loading filters...
FeaturedHeadlinesProject UpdatesWind Farm UpdateFoundationsSupply ChainBusiness & FinancePorts & LogisticsAuthoritiesPlanning & PermittingContracts & TendersIndustryJobs & RecruitmentFloating WindVesselsWind Turbines
All Recyclable Blades Installed at RWE’s 1.4 GW UK Offshore Wind Farm
Fixed-Bottom

All Recyclable Blades Installed at RWE’s 1.4 GW UK Offshore Wind Farm

All 150 recyclable blades have been installed at the 1.4 GW Sofia offshore wind farm, with more than half of the wind turbines now in place at the UK construction site. All 150 recyclable blades are now installed, 50 sets of three blades, one set per turbine, marking the UK’s first large-scale use o

about 10 months ago
Orlen Baltic East
Fixed-Bottom

Preliminary Seabed Surveys Completed at Orlen’s Baltic East Site Offshore Poland

Preliminary seismic and geotechnical surveys of the seabed have been completed at the Baltic East offshore wind farm site in the Polish Baltic Sea. Preliminary seabed surveys for the Baltic East project began at the end of June and lasted over 15 weeks, said Orlen Group, the developer of the offshor

about 10 months ago
Nordseecluster A RWE
Fixed-Bottom

All Turbine Foundations In Place at 660 MW Nordseecluster A Offshore Wind Project

All monopile foundations for the wind turbines have been installed at Nordseecluster A, the first phase of the 1.6 GW Nordseecluster offshore wind development in Germany, owned by RWE and Norges Bank Investment Management. Each of the 44 monopile foundations measures approximately 85 metres in lengt

about 10 months ago
Belfast Harbour
Fixed-Bottom

EnBW, JERA Nex bp Commit GBP 100 Million to Transform Belfast Harbour into Offshore Wind Hub

EnBW and JERA Nex bp have committed over GBP 100 million (approximately EUR 113.5 million) to Belfast Harbour to support the development of their Mona and Morgan offshore wind farms in the Irish Sea. The joint venture said the lease of Belfast Harbour’s D1 terminal will see the assembly and marshall

about 10 months ago
Ocean Winds to Consider Next Steps as US Court Rules BOEM Can Reevaluate SouthCoast Wind Approval
Fixed-Bottom

Ocean Winds to Consider Next Steps as US Court Rules BOEM Can Reevaluate SouthCoast Wind Approval

A US federal judge has ruled in favour of the motion filed by the Department of Justice (DOJ) and Bureau of Ocean Energy Management (BOEM) in an ongoing case in Massachusetts, which requested that the case be paused as they will voluntarily remand the approval given to the SouthCoast Wind project ea

about 10 months ago
ARB Wind NnG
Fixed-Bottom

NnG Awards BoP & Maintenance Contract for 450 MW Scottish Offshore Wind Farm

ARB Wind has been awarded a multi-year contract for above water foundation inspections and Balance of Plant (BoP) services by Neart na Gaoithe (NnG) Offshore Wind Limited for the 450 MW offshore wind farm in Scotland. ARB Wind will provide dedicated BoP technicians to deliver a wide range of service

about 10 months ago
Dogger Bank Wind Farm
Fixed-Bottom

UK Economy to Reap GBP 6.1 Billion from 3.6 GW Dogger Bank Offshore Wind Farm

The 3.6 GW Dogger Bank Wind Farm, which will become the world’s largest offshore wind farm once fully operational, will boost the UK economy by GBP 6.1 billion (approximately EUR 6.9 billion) during its lifetime and support thousands of UK jobs over the next decade, according to a report written by

about 10 months ago
Thor Wind Turbine
Fixed-Bottom

Qair Takes Full Control of Ayre Floating Wind while Bowdun Shifts to DEME and Aspiravi

French Qair has acquired full ownership of the 1 GW Ayre floating wind project and exited the 1 GW Bowdun offshore wind farm in Scotland. Thistle Wind Partners (TWP), a joint venture of Qair, Belgium’s DEME Concessions, and Aspiravi International, developed the two offshore wind projects. Under a re

about 10 months ago
PGE’s Baltica 1 Offshore Wind Project Ready for 2025 Polish Auction
Fixed-Bottom

PGE’s Baltica 1 Offshore Wind Project Ready for 2025 Polish Auction

PGE Polska Grupa Energetyczna (PGE) has obtained environmental approval for its 900 MW Baltica 1 offshore wind project, clearing the way for its participation in Poland’s upcoming offshore wind auction on 17 December 2025. The approval was issued by the Regional Directorate for Environmental Protect

about 10 months ago
Hornsea Three AMS Trenchless
Fixed-Bottom

Ørsted Offloads Half of Hornsea 3 in EUR 5.2 Billion Transaction with Apollo

Ørsted has entered into an agreement with Apollo-managed funds (Apollo) for a 50 per cent equity ownership share in the company’s 2.9 GW Hornsea 3 offshore wind farm in the UK. The total value of the transaction is approximately DKK 39 billion (about EUR 5.2 billion), and the total project investmen

about 10 months ago
Tariffs Hit US Offshore Wind Project, Costs Rise by USD 443 Million Mid-Construction
Fixed-Bottom

Tariffs Hit US Offshore Wind Project, Costs Rise by USD 443 Million Mid-Construction

Dominion Energy said in its third-quarter 2025 results that recently imposed US tariffs have been incorporated into the updated cost estimate for the Coastal Virginia Offshore Wind (CVOW) project. The company now places total capital costs for the 2.6 GW offshore wind farm at approximately USD 11.2

about 10 months ago
Iberdrola Secures EUR 500 Million Green Loan for 315 MW German Offshore Wind Farm
Fixed-Bottom

Iberdrola Secures EUR 500 Million Green Loan for 315 MW German Offshore Wind Farm

The European Investment Bank (EIB) has signed a EUR 500 million green loan with Iberdrola for the 315 MW Windanker offshore wind farm in Germany. The financing is guaranteed by the Spanish export credit agency, Cesce. This transaction with Iberdrola marks the inaugural use of a guarantee developed b

about 10 months ago
Dajin Final Batch Inch Cape Monopiles
Fixed-Bottom

Final Batch of Dajin-Built Monopiles for 1.1 GW Inch Cape Offshore Wind Farm Set Sail

Dajin Heavy Industry has shipped the third and final batch of monopiles for the 1.1 GW Inch Cape offshore wind farm in Scotland. The final batch of eight monopiles has set sail from Dajin Heavy Industry’s Dajin Penglai facility. With this shipment, all 22 monopiles for the project have now been disp

about 10 months ago
sea trials wind turbine installation vessel
Fixed-Bottom

Wind Turbine Installation to Start Soon on 2.6 GW US Offshore Project

All monopiles and almost half of the transition pieces (TPs) have been installed at the Coastal Virginia Offshore Wind (CVOW) project site, with wind turbine installation expected to start this month and the project anticipated to produce first power at the beginning of next year. The offshore wind

about 10 months ago
  • 1
  • …
  • 32
  • 33
  • 34
  • …
  • 121