Windhoist Limited has pre-assembled the 84th and final wind turbine tower on the Beatrice Pre-Assembly Project at Nigg Energy Park in Scotland. Siemens Gamesa awarded Windhoist with a contract to carry out wind turbine pre-assembly work for the 588MW Beatrice wind farm in May 2018, marking the Scott
The New Jersey Economic Development Authority (NJEDA) is developing an online supply chain registry for the local offshore wind market. The New Jersey Offshore Wind Supply Chain Registry will be a free portal where investors exploring offshore wind-related projects in New Jersey will be able to find
The Maryland General Assembly has passed the Clean Energy Jobs Act (CEJA) which will incentivize the development of 1.2 GW of additional offshore wind capacity off this US East Coast state by 2030. The assembly has subsequently sent the bill to the Governor’s desk for signature. The bill aims to acc
The Dutch Ministry of Foreign Affairs and the U.S. Bureau of Ocean Energy Management (BOEM) have signed a Memorandum of Understanding on offshore wind development. Dutch Consul General Dolph Hogewoning and BOEM Acting Director Walter Cruikshank signed the agreement on 8 April at the Consulate Genera
Senvion GmbH has filed for self-administered restructuring proceedings after refinancing discussions with lenders have so far not come to a positive conclusion. These preliminary self-administration proceedings relate to Senvion GmbH as well as its subsidiary Senvion Deutschland GmbH. The objective
Ready 4 Offshore Wind, a project led by the U.S. Business Network for Offshore Wind, has been selected to receive a part of a USD 1.6 million funding from the Rhode Island government. The project is among 12 partnerships announced by the Rhode Island Department of Labor and Training (DLT) and Govern
The Dutch IHC IQIP is investing in the BLUE Piling technology for driving the foundation piles of offshore wind turbines into the seabed. IHC IQIP has decided to join forces with Jasper Winkes, the developer of the BLUE Hammer, as it believes this technology “has a big future” and is a logical step
All 20 foundation monopiles built for the Formosa 1 Phase 2 have left the EEW SPC yard in Germany onboard two heavy load transport vessels and are en route to Taichung port in Taiwan, Jan De Nul said. Now that these components for the offshore construction are mobilized, the actual installation oper
The long-term success of offshore wind is being put at risk by restrictions on access to wind turbine performance data that prevent operators from reducing operations and maintenance costs by up to 30%, according to ONYX InSight. Better access to turbine data allows operators to not only reduce thei
JDR Cable Systems and the U.S. Tufts University have established a collaboration which includes an education office for students who wish to pursue an offshore wind career. The undergraduate Engineering Cooperative Education Office is dedicated to students who are in their junior and senior year and
Offshore energy support vessel operator, Seacat Services, has signed a multi-million-pound contract to build a catamaran for deployment in the offshore wind sector. Seacat Weatherly, designed by Southampton-based naval architect Chartwell Marine, will be constructed by Isle of Wight firms Diverse Ma
Offshore Wind Consultants (OWC) is launching an advisory service to help U.S. offshore wind developers navigate the project regulatory frameworks and permitting processes. The regulatory and permitting advisory service is expected to assist developers through processes at the federal, state and loca
Decisions on how US offshore wind farms will be financed are needed quickly to ensure smooth sailing for a growing number of offshore wind projects, according to a white report released by the Business Network for Offshore Wind (BNOW). “We may hit some windy financing turbulence with the loss of tax
Manor Renewable Energy (MRE) has secured a contract with EnBW to provide a temporary power package for the turbine installation phase of the Hohe See offshore wind project. MRE said it started providing a full temporary power package of generators, personnel and vessels in the German North Sea this