
German wind industry association WAB e.V. has signed a three-year cooperation agreement with Scottish partner DeepWind to collaborate for the expansion of offshore wind and the development of a market for green hydrogen from wind energy. WAB and DeepWind plan to exchange and analyze information, exp

A consortium including Engie and LM Wind Power has launched a project to design and manufacture the wind industry’s first 100 per cent recyclable turbine blade. The ZEBRA (Zero wastE Blade ReseArch) project is led by the French research center IRT Jules Verne. Apart from Engie and LM Wind Power, the

50Hertz has completed UXO clearance at the Ostwind 2 grid connection project in the German Baltic Sea. The project comprised unexploded ordnance recovery at the subsea cable routes that will connect the Arcadis Ost 1 and Baltic Eagle offshore wind farms to the German high voltage grid. Activities w

EnBW has opened a tender to hire sea-going vessels with crew for the main geotechnical investigation at the He Dreiht offshore wind project in Germany. According to EnBW, the aim of the new investigation is to meet with the governmental regulations for offshore wind farm installations according to B

French transmission system operator RTE Réseau de Transport d’Electricité has issued a contract notice seeking unexploded ordnance (UXO) target identification surveys across two offshore wind subsea cable routes. The work will be carried out along the export cable routes of the Fécamp and the Course

Sea and Land Project Engineering (SLPE) has won a contract to provide the turbine foundation concept design for the Inch Cape offshore wind project in Scotland. According to SLPE, the project site has varying seabed depths and ground conditions making it one of the most complex in Europe. This is sa

Van Oord has started installing the export cables which will connect the 1.5 GW Hollandse Kust (zuid) offshore wind farm to the Dutch grid, TenneT said. For the first ten kilometres of the cable route at sea, the four export cables will have to be buried more than 5,5 metres into the seabed in order

Dogger Bank Wind Farm, a 50:50 joint venture between SSE Renewables and Equinor, has signed a contract with GE Renewable Energy for 190 wind turbines for the Dogger Bank A & B offshore wind project. Dogger Bank A & B will be the world’s first offshore wind farm to use GE’s Haliade-X 13 MW turbines,

Dogger Bank Wind Farm has announced 320 jobs to be created in the UK’s North East so far, with the recruitment set to start in early 2021. In May, Dogger Bank Wind Farm said Equinor, which will operate the 3.6 GW wind farm for its expected life of more than 25 years, will construct an […]

INEOS has signed an agreement with Engie to buy 84 MW of energy produced by the Norther offshore wind farm in Belgium. The 84 MW will initially be used by existing INEOS production sites and later by Project ONE, the company’s investment in two chemical plants for the production of ethylene and prop

North East England’s offshore wind cluster Energi Coast is launching a new Innovation Group which aims to develop long-term solutions to meet the requirements for new technology in offshore wind. The purpose of the group is to progress major innovation opportunities for the region’s offshore wind in

Ørsted has held the groundbreaking ceremony in the Port of Taichung for the Operations and Maintenance (O&M) base of the 900 MW Greater Changhua 1 & 2a offshore wind farms. Scheduled to be operational from 2022 and onwards, the O&M base is the first of its kind that Ørsted has invested in building i

The Danish Energy Agency and the World Bank Group have prepared a roadmap for the development of offshore wind in Vietnam, which recommends that 10 GW of offshore wind power could be operational in the country by 2030. The Input to Roadmap for Offshore Wind Power Development in Vietnam report also r

Dogger Bank Wind Farm has confirmed Able Seaton Port in Hartlepool, UK, as the marshalling base for the wind turbine installation activities for the Dogger Bank A & B offshore wind project. As part of the agreements for the supply and service of 190 of GE Renewable Energy’s Haliade-X 13 MW wind turb