Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

All

Loading filters...
Fixed-BottomFoundationsProject UpdatesSupply ChainWind Farm UpdateIndustryTraining & EducationVesselsEnvironmentFloating WindResearch & DevelopmentOperations & MaintenanceCablesContracts & TendersGreen HydrogenPower-to-XClean FuelsOutlook & StrategyBusiness & FinanceBusiness developmentPorts & LogisticsPlanning & Permitting
Navantia and Windar Ship Last Batch of Monopiles for East Anglia Three
Fixed-Bottom

Navantia and Windar Ship Last Batch of Monopiles for East Anglia Three

Navantia Seanergies and Windar Renovables have shipped the final monopiles for East Anglia Three directly to the offshore project site in the UK. The monopiles for the 95-turbine offshore wind farm are being supplied by Haizea Wind Group and the Navantia-Windar consortium, with Windar also deliverin

about 5 months ago
OWA Becomes Second US Organisation to Receive IACET Accreditation for Offshore Wind Training Programmes
Industry

OWA Becomes Second US Organisation to Receive IACET Accreditation for Offshore Wind Training Programmes

The Offshore Wind Academy (OWA) has received accreditation from the International Accreditors for Continuing Education and Training (IACET), becoming the second organisation in the US offshore wind sector to obtain the certificate. The accreditation allows the Massachusetts-based training provider t

about 5 months ago
First Foundations Installed at 1.5 GW Polish Offshore Wind Farm
Fixed-Bottom

First Foundations Installed at 1.5 GW Polish Offshore Wind Farm

Major offshore construction work has started on the 1.5 GW Baltica 2 offshore wind farm, developed by Ørsted and PGE Polska Grupa Energetyczna, as Van Oord has installed the first monopile foundations at the project site in the Polish Baltic Sea. The offshore installation campaign, for which Van Oor

about 5 months ago
ScotWind Developers Fund Study to Find Out More About Minke Whale Activity
Environment

ScotWind Developers Fund Study to Find Out More About Minke Whale Activity

Underwater acoustic monitoring equipment has been deployed off Scotland’s east coast as part of a two-year study aimed at improving the understanding of minke whale activity in areas being considered for offshore wind farms’ export cable routes. The work, led by the Scottish Association for Marine S

about 5 months ago
Dong Fang Offshore Launches SOV Booked by Vestas
Fixed-Bottom

Dong Fang Offshore Launches SOV Booked by Vestas

about 5 months ago
Fugro Starts Geotechnical Survey Work for 1.4 GW Berwick Bank B Offshore Wind Farm
Fixed-Bottom

Fugro Starts Geotechnical Survey Work for 1.4 GW Berwick Bank B Offshore Wind Farm

Fugro has started geotechnical survey work for the Berwick Bank offshore wind project under a contract the company was awarded by SSE Renewables. The contract covers geotechnical investigations for Berwick Bank B, the second phase of the wider 4.1 GW offshore wind development in Scotland, planned to

about 5 months ago
TKF to Supply Inter-Array Cables for 1 GW Dutch Offshore Wind Farm
Cables

TKF to Supply Inter-Array Cables for 1 GW Dutch Offshore Wind Farm

about 5 months ago
Ta San Shang Marine Takes Delivery of Damen-Built CSOV
Vessels

Ta San Shang Marine Takes Delivery of Damen-Built CSOV

Ta San Shang Marine (TSSM), a joint venture between Japan’s Mitsui O.S.K. Lines (MOL) and Taiwan’s Ta Tong Marine, has taken delivery of a construction service operation vessel (CSOV) designed and built by the Dutch shipbuilder Damen. The 90-metre vessel, named TSS Cruiser, was built in Vietnam unde

about 5 months ago
Olympic Subsea’s Methanol-Ready Vessel Duo Enters Construction
Clean Fuels

Olympic Subsea’s Methanol-Ready Vessel Duo Enters Construction

The CMHI shipyard in Shenzhen, China, has begun the construction of two methanol-ready dual-fuel multipurpose subsea vessels for Norway’s Olympic Subsea. Olympic Subsea reported that earlier in April the keel laying for the first vessel and the first steel cutting for the second vessel took place at

about 5 months ago
Acta Marine’s Newly Delivered CSOV to Debut at Dutch Offshore Wind Farm
Project Updates

Acta Marine’s Newly Delivered CSOV to Debut at Dutch Offshore Wind Farm

about 5 months ago
Port of Blyth Unveils GBP 100 Million Expansion for Next-Generation Offshore Wind Projects
Business & Finance

Port of Blyth Unveils GBP 100 Million Expansion for Next-Generation Offshore Wind Projects

Port of Blyth has launched an expansion project to support the UK offshore wind sector, with the proposed Battleship Wharf Expansion scheme representing an investment of up to GBP 100 million (approximately EUR 116 million). The upgrades to the port’s marine and terminal infrastructure are planned t

about 5 months ago
Thistle Wind Partners Files Offshore Consent Application for 1 GW Bowdun Project
Fixed-Bottom

Thistle Wind Partners Files Offshore Consent Application for 1 GW Bowdun Project

Thistle Wind Partners (TWP) has submitted the offshore consent application for its Bowdun offshore wind farm to the Scottish Government’s Marine Directorate. Located off the north-east coast of Scotland, 44 kilometres from Stonehaven in Aberdeenshire , the fixed-bottom offshore wind farm is planned

about 5 months ago
Ayre project team at Kirkwall Harbour
Ports & Logistics

Qair Browsing Scottish Ports for 1 GW Floating Wind Farm’s O&M Base

Qair, the developer of the Ayre floating offshore wind farm, has started working on advanced plans for a long-term operations and maintenance...

about 5 months ago
Qair Browsing Scottish Ports for 1 GW Floating Wind Farm’s O&M Base
Business & Finance

Qair Browsing Scottish Ports for 1 GW Floating Wind Farm’s O&M Base

Qair, the developer of the Ayre floating offshore wind farm, has started working on advanced plans for a long-term operations and maintenance (O&M) base in northern Scotland, a facility that is expected to support up to 120 jobs. The floating wind farm is planned to be built at an offshore site east

about 5 months ago
  • 1
  • …
  • 32
  • 33
  • 34
  • …
  • 2960