After Seaway Heavy Lifting chose to use a vibratory hammer to install monopile foundations at the Riffsgat offshore wind farm, APE Holland informed that vibrating 30 steel monopiles started mid-June. The piles will be driven with the Super Quad Kong (SQK), a modular vibratory driver/extractor consis
The Maine Wind Industry Initiative (MWII) received recognition this week for its public and industry educational efforts in the areas of wind and ocean energy. Energy Ocean International 2012 presented the Academic Pioneer Award to MWII Director, Paul Williamson, during its annual conference held th
Research and Markets has announced new report titled “Hong Kong Power Report 2012”. BMI View: Thermal energy continues to account for the almost all of Hong Kong’s domestic energy production; while there have been some tentative steps towards generating energy from renewable sources, these have been
The fact that there is more to building a wind farm then just infrastructure has been confirmed by the recent statements of general manager of Scira Offshore Energy, EinarStrømsvåg, who pointed out that building of a strong local labor force is as important for wind energy production to gain a full
Dudgeon Offshore Wind Limited (DOW), a subsidiary of Warwick Energy Limited, has received the planning permissions needed to construct and operate the onshore cables for the proposed Dudgeon Offshore Wind Farm (Dudgeon) project. The permission received from the Planning Inspectorate covers the north
On the longest day of the year Arklow Marine Services successfully launched its second 20 metre wind farm service vessel into the River Avoca at Arklow. The vessel looking splendid in her Alicat colours has again been delivered ahead of the scheduled delivery date. Local people crammed the quaysides
After the Vestas company resigned from its manufacturing plans that would have created about 1,600 jobs, a task force has been set up to attract new manufacturers to north Kent, BBC News reports. Danish company Vestas was supposed to manufacture wind turbines at Sheerness Dock, a huge new plant on t
The enterprise general meeting in Statkraft SF has today elected Olav Fjell as the new chair of the board of Statkraft SF. The general meeting in Statkraft AS has then elected Olav Fjell as the new chair of the board of Statkraft AS. The board of Statkraft AS is identical with the board of Statkraft
RenewableUK has expressed disappointment that Vestas will not be proceeding with plans to build a manufacturing facility in Sheerness, but stated the prospects for offshore wind manufacturing and employment in the UK remain high. Maria McCaffery, CEO of RenewableUK stated: “Naturally we are disappoi
During its Board Meeting on Friday, the European Renewable Energy Council (EREC) elected a new President, Rainer Hinrichs-Rahlwes, who replaces Arthouros Zervos, EREC’s founding President. “After years of stable growth, renewables are now facing some difficulties in the current political and economi
Parker Hannifin Corporation, the leader in motion and control technologies, announced it will be launching its line of precision cooling units for wind turbines for the European wind market, utilizing the company’s two-phase evaporative cooling technology for large and offshore wind turbines, at the
Saturday the 9th of June, Holland Shipyards successfully delivered a 32 persons accommodation module to Keppel Verolme. The accommodation module was built under high QA/QC demands and a stringent deadline, which were both met by the yard. This accommodation will be placed on the Transformer Substati
FRISIA-Offshore, located in Germany, and Offshore Wind Services BV from the Netherlands announced a cooperation agreement. The intention of FRISIA-Offshore and OWS is to invest together in new Crew Transfer Vessels through a joint venture in the coming months. This joint venture will serve as growth
Germany is dealing with more delays in connecting planned offshore wind farms to the grid. That is, RWE Innogy has been notified by TenneT TSO GmbH that there will be much more than 12 months of delay in connecting the Nordsee Ost wind farm, the Dow Jones Newswires reported a confirmation from a RWE