Gamesa and AREVA signed binding agreements for the creation of a joint venture in the promising offshore wind energy industry, culminating the exclusive talks initiated last January. The closing of the transaction is expected to be secured by the fourth quarter of this year, subject to approval by t
Atlantis, a vertically integrated equipment supplier and project owner in the tidal power industry, noted report regarding the Department of Energy & Climate Change’s likely participation in the MeyGen Project. The MeyGen project, which is 100% owned by Atlantis, is located in the Pentland Firth in
MHI Vestas Invites Suppliers MVOW has now launched a new website which includes a supplier gateway which allows companies to submit their details online to request to become a supplier to MVOW. Sif Group Expands Its Production Capacity, Manufactures Supersize Monopiles In the future, the length and
Providing power for offshore operations on a transition piece in the construction phase is an essential service when working on the lifeless transition piece. Recently GeoSea chartered the Guardian, Braveheart Shipping’s survey vessel, to provide power by cable to the transition piece in the Borkum
Thorsten Jalk, Chief Executive Officer of DBB Jack-Up Services A/S, has written an article on reducing costs of offshore wind energy. The article was published by OffshoreWindOM.com, a new online platform for operations and maintenance professionals in the offshore wind industry, powered by DBB Jack
Seabed mapping specialists Osiris Hydrographic & Geophysical Projects were successful at the ECHO Regional Business Awards winning the MSIF Business of the Year award (51-250 employees). Osiris Projects, owned by the locally headquartered Bibby Line Group, were in attendance at the ceremony, held at
The installation of a wave energy park off Sotenäs Municipality in Sweden started on July 1. The generator is placed on the seabed and connected to the buoys on the surface that capture the wave motion energy, transforming this into electrical energy. The wave devices are connected through a switch
The deadline to register as an interested party with the Planning Inspectorate for the Navitus Bay wind farm proposal has passed. According to Daily Echo, the majority of 2,700 participants who applied have a negative opinion about the project. “What is striking when you look at the comments is that
The Dudgeon Wind Farm Limited has awarded the contract for the Monopile Foundation Fabrication for its Dudgeon Offshore Wind Farm to Sif Group B.V. The contract covers the procurement, fabrication and assembly of 67 monopiles (MPs) and 67 transition pieces (TPs), including transportation to the Dudg
The Office for Energy Planning Approval of the German state of Schleswig-Holstein has issued a planning approval decision for the first section of NordLink interconnector, a planned submarine cable from Norway to Germany. “With this decision, the next important component of the future power system h
Specialist Marine Consultants Ltd (SMC) has begun another contract with Siemens Wind Power to provide marine coordination. The provision of services for the Baltic 2 offshore wind farm started at the beginning of July 2014 and sees SMC providing marine coordination on five offshore wind farm constru
Hydrodynamic test at UPC wave flume has been conducted on a scaled model of a monolithic floating concrete offshore platform for wind turbines. Alternative floating offshore substructures for offshore wind farms (AFOST) project, under the KIC-InnoEnergy (EIT), is currently in the prototype verificat
UK’s North East engineering firm Osbit Power, part of the Energi Coast steering group, is helping Japan to reinvigorate one of its regions, following a natural disaster in 2011, after signing a contract to supply a key piece of safety equipment to a project to build the country’s first offshore wind
The first phase of Zhuhai Guishan Offshore Wind Farm has moved forward by selecting Shanghai Taisheng Wind Power Equipment Co. as the provider of steel jacket foundations. The company will build 27 four-legged jacket foundations for offshore wind turbines off Guangdong province, China, which are exp