Siemens Power Generation Services, Wind Power & Renewables business has a new global CEO. Mark Albenze succeeds Tim Holt who is taking over new responsibilities within Siemens. Prior to assuming this new position, Albenze served as CEO of the Siemens Wind Power onshore business in the Americas from
Yesterday, Long Island Assemblyman Englebright joined dozens of community leaders at a rally outside LIPA headquarters calling on Governor Cuomo and Long Island Power Authority (LIPA) to commit to offshore wind power this year. The Assemblyman presented LIPA with a letter of from the Long Island del
The Bay of Fundy is now wired for power. Four underwater power cables have been successfully installed in the Minas Passage, each able to deliver electricity directly to homes across the province. The Fundy Ocean Research Center for Energy (FORCE) has laid four cables along the sea floor of the Mina
DONG Energy issued an interim financial report for 9M 2014, which states that the company’s EBITDA was DKK 13.0 billion for this financial period, compared with DKK 11.2 billion for 9M 2013. The increase relative to the same period last year was due to higher earnings from wind activities, including
Resolute Marine Energy has announced the appointment of Andrew Parish to its Advisory Board. Andrew has over 25 years of senior experience in the water and energy sectors. He commenced his career in water treatment working in both municipal and industrial organizations and has spent many years in en
Offshore WIND’s photo of the day: Sunset at West of Duddon Sands offshore wind farm, seen almost a year ago. Following yesterday’s official launch of the West of Duddon Sands offshore wind farm, it is nice to remember the good old times, especially some beautiful moments like the one caught on camer
The master of a wind farm passenger transfer vessel has today been ordered to pay £9,702 in fines and costs after pleading guilty to a breach of the Merchant Shipping Act 1995. Michael Gallagher was in charge when the workboat catamaran Windcat 9 with 15 people on board when it hit a large floating
To simplify the EIA process associated with the consenting of marine renewable projects, the UK’s National Standard Body, BSI (British Standards Institution) and Innovate UK have commissioned ABPmer to facilitate the development of a document which compiles existing guidance and makes recommendation
The GROW:OffshoreWind initiative supporting manufacturing business in the offshore wind supply chain will be appearing at the RenewableUK 2014 Conference & Exhibition, from 11–13 November 2014 in Manchester Central. GROW:OffshoreWind will form part of an action-packed day aimed at showcasing all tha
Scottish Enterprise has awarded The Environmental Consultancy Ltd (TEC) a contract for Inshore Ecological Surveys in Cockenzie, where it plans to create a manufacturing facility to service the offshore wind industry. Scottish Enterprise has undertaken initial feasibility (including the preparation o
Final preparations are underway for the launch of Osiris Projects’ custom build survey vessel “Bibby Athena”. Due to launch before the end of 2014, Bibby Athena will build on the capabilities of the very successful sister vessel, Bibby Tethra, with a number of subtle changes to reflect the company’s
The European Commission has concluded that the €86.6 million aid, granted by France to the “Supergrid Institut pour la transition énergétique” for a research project aimed at developing a new generation of long-distance energy transmission networks, complies with the EU rules on State aid. Joaquín A
Eolien Maritime France, a subsidiary of EDF EN France and DONG Energy, has invited tenders for the delivery and installation of inter-array grid for Courseulles sur Mer, Fecamp and Saint-Nazaire’s offshore wind farms. The scope concerns the design, engineering, procurement, construction, transport,
ESB and EIB have today signed a loan facility for €100 million. These funds will be used to enable continued investment in the electricity network in the south west region of the country to connect renewable energy to the national transmission network. This is the second part of a total loan facilit