Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

All

Loading filters...
VesselsBusiness & FinanceOperations & MaintenanceNewsGrid ConnectionTechnologyWind Farm Update
Alewijnse Signs Long-Term Agreement with Van Oord
Vessels

Alewijnse Signs Long-Term Agreement with Van Oord

Alewijnse Marine Systems and international dredging and marine contractor Van Oord have signed a long-term service level agreement covering the Van Oord cable-laying vessels Nexus and HAM601. The contract was started on 1 September 2015 and will run for three years. The partnership involves the mana

about 11 years ago
DBB Jack-Up Earns Two More Years of MHI Vestas O&M
Business & Finance

DBB Jack-Up Earns Two More Years of MHI Vestas O&M

DBB Jack-Up Services A/S and MHI Vestas Offshore Wind A/S have extended their framework agreement for offshore wind operations and maintenance services until the end of 2017. The companies signed a framework agreement for offshore wind O&M services in December 2014. “During 2015 we have experienced

about 11 years ago
Deutsche Windtechnik Extends Its Services at DanTysk
News

Deutsche Windtechnik Extends Its Services at DanTysk

Deutsche Windtechnik Offshore and Consulting and Vattenfall expand their cooperation for the DanTysk offshore wind farm. Starting at the end of June, 2015, the German company now also maintains and inspects all transition pieces and foundations above and below the water level of the 80 Siemens turbi

about 11 years ago
Bureau Veritas Acquires HydrOcean
News

Bureau Veritas Acquires HydrOcean

Bureau Veritas has finalized the acquisition of HydrOcean, a French engineering company specialized in hydrodynamic digital simulation for the maritime industry. Established in 2007, HydrOcean provides design support for the construction of ships, offshore structures, racing yachts and marine energy

about 11 years ago
Canyon Offshore to Bury Dudgeon Cables
Grid Connection

Canyon Offshore to Bury Dudgeon Cables

Canyon Offshore Ltd, the robotics subsidiary of Helix Energy Solutions Group Inc., has been awarded a multi-million pound project with VBMS Ltd on the Statoil, Masdar and Stakraft Dudgeon Offshore Wind Farm for the supply of its services to provide the trenching solution for inter array cables. As p

about 11 years ago
Guernsey Continues Feasibility Study on Local OW Project
News

Guernsey Continues Feasibility Study on Local OW Project

Commerce and Employment’s (C&E) Renewable Energy Team (RET) and Guernsey Electricity Limited (GEL) have formalised and extended the feasibility work that they are jointly undertaking to research an offshore wind project for Guernsey electricity consumption in local waters. This joint work will look

about 11 years ago
ORE Catapult: ‘Decision tree’ to Help Lower Marine Energy Costs
News

ORE Catapult: ‘Decision tree’ to Help Lower Marine Energy Costs

A new research project looking at optimum layouts for offshore electrical connections for marine energy farms has developed a ‘decision tree’ to help guide designers and developers towards the most cost effective array configuration for their development. The Optimum Electrical Array Architectures r

about 11 years ago
OPT Deploys PowerBuoy off Atlantic City
Technology

OPT Deploys PowerBuoy off Atlantic City

Ocean Power Technologies, Inc. (OPT) has deployed its APB350 A1 PowerBuoy approximately 14 miles northeast of Atlantic City, New Jersey. The APB350 A1 contains an improved Power Takeoff (PTO) system compared to the APB350 that was deployed in 2011 in connection with the U.S. Navy’s Littoral Expediti

about 11 years ago
Westermost Rough Funds New Withernsea Promenade
News

Westermost Rough Funds New Withernsea Promenade

Westermost Rough offshore wind farm has committed £80,000 to deliver a brand new promenade feature for Withernsea in the East Riding of Yorkshire. Westermost Rough is teaming up with the Withernsea and South East Holderness Regeneration Partnership and Withernsea Big Local Partnership to install a p

about 11 years ago
EU to Approve GE-Alstom Acquisition
Business & Finance

EU to Approve GE-Alstom Acquisition

European Commission is set to approve GE’s acquisition of French company Alstom for the sum of €12.35bn, reports Agence France-Presse. A source close to the matter said the European Competition Commissioner Margrethe Vestager will hold a press conference later today to make the announcement, followi

about 11 years ago
SeaZip Orders Two Damen FCS 2610
Vessels

SeaZip Orders Two Damen FCS 2610

Harlingen-based SeaZip Offshore Service BV has signed a newbuilding order for two Damen Fast Crew Suppliers (FCS) 2610. The vessels are yet to be built are expected to be delivered in March 2016 and will primarily be deployed in the building, operation and maintenance of large-scale wind farms in th

about 11 years ago
Faulty Cable to Be Replaced at Swedish Wave Project
Operations & Maintenance

Faulty Cable to Be Replaced at Swedish Wave Project

Fortum and Seabased Industry have agreed to replace an export cable at their Sotenäs demonstration wave power plant off the coast of Smögen, Sotenäs community, in western Sweden. The companies said that several insulation failures occurred during connection of the plant this summer, so a new cable h

about 11 years ago
Miros to Monitor Waves and Draught on Bold Tern
News

Miros to Monitor Waves and Draught on Bold Tern

Fred Olsen Windcarrier AS in Norway has bought Miros’ new WaveSystem 200, which has been installed on the Bold Tern WTI jack-up vessel. The WaveSystem 200 is a wave monitoring system utilized on jack-up vessels to give accurate wave parameters and draught data. The real time wave and draught data gi

about 11 years ago
Fugro to Install Rampion Array Cables
Grid Connection

Fugro to Install Rampion Array Cables

Fugro has been awarded a contract for the installation and burial of array cables at the Rampion Offshore Wind Farm. The development in the English Channel, 13 kilometres off the Sussex coast, is being built by E.ON alongside partners, the UK Green Investment Bank plc. The engineering and planning w

about 11 years ago
  • 1
  • …
  • 1576
  • 1577
  • 1578
  • …
  • 2960