All 80 turbines at Amrumbank West offshore wind farm are connected to the network. With its full installed capacity of 288 megawatts now operational, Amrumbank West can produce enough climate-friendly power to meet the needs of 300,000 households. Amrumbank West, fully owned by E.ON, is located in t
A £10m EU boost for the development of the new Menai Science Park has been announced by Welsh First Minister Carwyn Jones. The project, led by Bangor University, has already been awarded £10m from the Welsh Government. The EU funding provides the remainder of the investment needed for the first phas
CCCC Third Harbor Engineering Co., Ltd. has recently won the bid for Phase 2 of the Shanghai Lingang offshore wind project with a contract value of some 478 million yuan (approx. EUR 67 million) and a construction period of 430 days. Located in the eastern waters of the Nanhui beach in Shanghai, the
Dalby Offshore apprentices Chris Baxter and Nick Marsay have both successfully completed their first stint on the Dalby fleet. After completing their medical, STCW, Slinger & Banksman course, and learning some basics at 54 North Maritime Training, they were ready for their first trip to sea. The two
Atlantic Towing Limited of Dartmouth, Nova Scotia has secured a contract to provide marine tug and barge services to the Cape Sharp Tidal project. Cape Sharp Tidal is a multi-phase project with plans to grid-connect a 4MW demonstration tidal array in Nova Scotia’s Bay of Fundy in the coming months.
The Grid Code defines the working conditions for the operators of the grid administrators and the distributer or end user concerning the operation of, and the connection to, the grid, how the grid is functioning, and connections to other grids. They are the rules to which generating plants have to c
JDR has expanded its service footprint with PD Ports in Hartlepool to support its continued growth in the oil and gas and renewables sectors, the company reported today. JDR has been a tenant at the Port of Hartlepool since first acquiring 97,000 square foot (sq.ft.) of warehouse space in 2008 and s
Fraunhofer IWES’ Dynamic Nacelle Testing Laboratory (DyNaLab) has started operating. After an 18-month construction period, a 100-tonne generator of a 3 MW wind turbine was set in motion on the new test stand. Fraunhofer IWES said the EUR 35 million infrastructure will boost the competitiveness of q
Investment, jobs and skills generated by the East of England’s position as a leading centre for developing offshore wind farms are at stake as the industry awaits clarity in policy, an industry leader has warned. The UK is being left behind by the rest of Europe as the industry waits for a sign from
The East of England’s unique all-energy coast is key to the East Anglian powerhouse alongside new technology and science, the Great Yarmouth MP Brandon Lewis told energy leaders at the East of England Energy Group (EEEGR) annual general meeting. “The opportunities are here – in decommissioning in th
During the Offshore Energy Exhibition and Conference 2015, Offshore WIND met with Yarco Hoddenbach, Business Analyst at Seaway Heavy Lifting. As the offshore wind market is maturing in Europe, we looked into how government is supporting the further expansion of the industry. Also, we bring you a gli
Ocean Power Technologies (OPT) has begun Accelerated Life Testing (ALT) on its redesigned APB350 power takeoff (PTO) system as part of its effort to demonstrate product reliability and durability, and to accelerate toward product commercialization. The OPT ALT process consists of operating PTOs in t
A Scotland-based offshore wind service provider, Delta Marine, recently awarded Damen a construction contract for a new vessel specially designed for the offshore wind industry, looking towards a launch in early 2017. A cooperation between the two companies has produced a new vessel design, called a
Gardline Environmental’s Coastal Division has recently been awarded contract extensions at the London Array offshore wind farm. These extensions mean that the Marian Array, Ellida Array and Smeaton Array, as well as the Gardian 7, will continue crew transfer operations supporting the O&M teams at Lo