Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

All

Loading filters...
Operations & MaintenancePorts & LogisticsVesselsNewsBusiness & FinanceWind Farm UpdateR&DTechnology
Port of Cherbourg Preparing for French OWFs
Operations & Maintenance

Port of Cherbourg Preparing for French OWFs

Port of Cherbourg is getting ready for the first French offshore wind farms, with 44ha of port land alongside a heavy-load quay with a bearing capacity of 15t/m2 already available for the marine renewable energies sector. The new heavy-load quay has been in service since March 2015. With the ongoing

about 11 years ago
Seacat Services Orders 4 New Vessels
Vessels

Seacat Services Orders 4 New Vessels

Seacat Services has placed an order for up to 4 new vessels with South Boats IoW. The DNV-GL class-certified next generation 23m and 27m catamarans have been specifically designed to cater for the changing needs of European offshore projects, Seacat said in a press release issued today. With Seacat

about 11 years ago
Prysmian Wraps Up 66kV Subsea Cable System Testing
News

Prysmian Wraps Up 66kV Subsea Cable System Testing

Prysmian Group has recently completed the electrical type tests on its 66kV complete submarine cable system. Tests were carried out according to CIGRE and IEC testing protocols. The tested solution – that includes also factory, field joints and click-fit terminations – combines the use of EPR insula

about 11 years ago
Greig Joins RCG’s Ranks
Business & Finance

Greig Joins RCG’s Ranks

The Renewables Consulting Group (RCG) has added Elaine Greig to its team as a Director and Head of Service Delivery. Greig has over 22 years’ experience in the electricity supply industry, with the last 14 in wind energy development, engineering, finance, construction and operations. She has joined

about 11 years ago
EWEA’s Statement on Recent Tragic Events in Paris – EWEA 2015 Taking Place as Planned
News

EWEA’s Statement on Recent Tragic Events in Paris – EWEA 2015 Taking Place as Planned

In light of the recent tragic events in Paris, France, the European Wind Energy Association (EWEA), which is organizing its annual exhibition and conference in Paris from 17 to 20 November, has released the following statement: The European Wind Energy Association expresses its sincere condolences a

about 11 years ago
Marine Energy Industry Drafts Policy Recommendations to DECC
News

Marine Energy Industry Drafts Policy Recommendations to DECC

South West Marine Energy Industry informed today that it submitted a draft set of policy recommendations which are intended to accelerate the commercialisation of wave and tidal energy to the UK Department of Energy and Climate Change (DECC) minister Andrea Leadsom, Regen SW informed. Johnny Gowdy s

about 11 years ago
25MW Floating Wind Farm Planned off Portugal
Wind Farm Update

25MW Floating Wind Farm Planned off Portugal

EDP Renewables (EDPR), Mitsubishi Corporation (through its subsidiary Diamond Generating Europe), Chiyoda Corporation (through its subsidiary Chiyoda Generating Europe), Engie and Repsol today announced an agreement to implement a floating offshore wind farm off the coast of Northern Portugal, known

about 11 years ago
‘Seajacks Zaratan’ to Install Veja Mate TPs
Vessels

‘Seajacks Zaratan’ to Install Veja Mate TPs

Seajacks Zaratan has been contracted to install 67 transition pieces (TPs) at the Veja Mate offshore wind farm. The 400MW wind farm will be based 95km north-west of Borkum in the German exclusive economic zone. Seajacks Scylla will also be installing Veja Mate’s 67 monopiles, starting Q1 2016 with f

about 11 years ago
Deutsche Windtechnik Ramps Up International Ops
Operations & Maintenance

Deutsche Windtechnik Ramps Up International Ops

Deutsche Windtechnik AG is stepping up its foreign operations, especially in Spain, Poland and the United Kingdom. By the end of 2015 the company will have 122 employees outside Germany, 43 more than at the start of the year. Deutsche Windtechnik aims to increase the proportion of foreign revenue fr

about 11 years ago
FINO 1 Measurement Equipment Upgraded
R&D

FINO 1 Measurement Equipment Upgraded

In order to improve quality and capabilities of the reference met mast measurements at FINO1, DEWI has recently upgraded the acquisition modules and data logging system on the research platform, NORCOWE reported. The new measurement system, among other things, enables higher frequency data sampling

about 11 years ago
Swire to Provide WTIV for Galloper Offshore Wind Farm
Vessels

Swire to Provide WTIV for Galloper Offshore Wind Farm

Swire Blue Ocean A/S announced today that it had signed a contract with Siemens to provide a vessel for the installation of 56 wind turbines at the Galloper offshore wind farm. On 30 October, Siemens received an order for 56 of its 6MW wind turbines, including a 15-year service contract, for the Gal

about 11 years ago
Global Marine Systems Re-Enters Offshore Wind Market
Business & Finance

Global Marine Systems Re-Enters Offshore Wind Market

Global Marine Systems Limited is re-entering the offshore renewables market after a three-year absence, the company informed in a press release issued today. Global Marine highlighted its recent contract for an inter-array project at the Wikinger offshore wind farm as the one that marked its return

about 11 years ago
Nordsee One Engages SeaPlanner
Technology

Nordsee One Engages SeaPlanner

The SeaPlanner software has been selected as a marine coordination and management tool for the Nordsee One offshore wind farm. Nordsee One is the first project to utilize the recent upgrades to the SeaPlanner software, which includes a new mapping platform featuring an enhanced vessel guard zone ale

about 11 years ago
Subhub Installed and Retrieved in Real Tidal Conditions
Technology

Subhub Installed and Retrieved in Real Tidal Conditions

QED Naval has reported that it completed installation and retrieval trials of the Subhub operations model in real tidal conditions. The company said it installed the model on the seabed in a controlled manner within minutes and then secured it on the seabed overnight, before being recovered to the s

about 11 years ago
  • 1
  • …
  • 1538
  • 1539
  • 1540
  • …
  • 2960