Bladt Industries has published a photo of one of the 60 transition pieces that the company will manufacture for the Arkona offshore wind farm. EEW SPC and Bladt are in charge of supplying the foundations for the project, with EEW delivering 60 monopiles and Bladt providing the transition pieces. Bot
RES has been awarded a five year contract to provide O&M services to offshore transmission assets owned by Blue Transmission Walney 1 Ltd. In addition to providing the scheduled and unscheduled maintenance of the equipment, the contract will provide services related to asset and site management, log
The Council of Ministers in Portugal has approved the development of the 25MW WindFloat Atlantic (WFA) floating wind farm project in Viana do Castelo. With the approval from the government, the project can enter the offshore construction phase and will receive a license to connect to the national gr
In a random sampling of public opinion taken by the Forum Poll among 1,184 Ontario voters, over one half, or 52%, favour offshore wind farms. 26% of the voters polled disapprove offshore wind farms and 22% do not have an opinion on the matter. The poll has also shown that almost two thirds (65%) of
On Friday, Maritime Safety Committee of the United Nations’ International Maritime Organization (IMO) adopted interim recommendations on safe carriage of offshore technicians and agreed on a definition of these technicians – so-called industrial personnel – under which wind turbine technicians and i
Sixteen shortlisted candidates for a EUR 3 million scientific research programme to understand the environmental impacts of offshore wind at Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) in Aberdeen, Scotland, have submitted their final bids. The shortlisted projects span topics from
The Carbon Trust has invited responses to a survey on underwater inspection methods to support identified emerging technologies in both oil and gas and renewables as part of its Offshore Wind Accelerator Programme. The Carbon Trust has identified that offshore wind is increasingly reliant on a numbe
Trump to UK Politicians: “Move Scottish Wind Farms Offshore” The US President-Elect Donald Trump has reportedly advised UK politician Nigel Farage and his team, with whom Trump met on 13 November, to campaign against onshore wind farms in Scotland, suggesting that they should be moved offshore. Dutc
Seaway Heavy Lifting (SHL) has been awarded an EPCI contract for the Trianel Windpark Borkum II offshore wind farm, which includes engineering, procurement, construction and installation of wind turbine foundations, comprising of monopiles and transition pieces. Project management and engineering ha
Belgian offshore engineering specialist GeoSea has appointed the offshore wind services provider CWind to undertake required secondary works at the 336MW Galloper offshore wind farm for a period of approximately six months starting in December 2016. This involves a wide range of tasks including, pai
DONG Energy has awarded the Rostock-based EEW Special Pipe Constructions GmbH with a contract to manufacture 116 monopiles for the 174-turbine Hornsea Project One offshore wind farm in the UK. “Due to the scale of the project, Hornsea Project 1 has changed the way we are doing offshore wind projects
Today (25 November), Navantia reported that it signed a contract for 42 East Anglia One jacket foundations, eight more than the initial number of foundations it was supposed to build, thus solving the equation that emerged after Lamprell announced it will build 60 jackets for the 102-turbine project
DNV GL-led WIN WIN joint industry project (JIP) results indicate that, especially for marginal oil & gas fields supplying production to a major field, floating wind-powered water injection is technically feasible in general. This specific application is claimed to offer an excellent business case to
ScottishPower Renewables has awarded Lamprell with a USD 225 million (approx. EUR 212 million) contract for the fabrication and supply of 60 jacket foundations and their accompanying piles for the East Anglia One offshore wind farm. Fabrication work in Lamprell’s Jebel Ali and Sharjah yards in the U