The New York State Energy Research and Development Authority (NYSERDA) has published “The Metocean Plan”, authored by the UK-based Carbon Trust, which was supported by Frazer Nash Consultancy. The plan aims to support developers and financiers with the deployment of floating Light Detection and Rang
The first ever wind turbine blades manufactured at Siemens (now Siemens Gamesa) blade factory in Hull have been loaded onto A2SEA’s wind turbine installation vessel Sea Installer at the Port of Hull and are en route to the Race Bank site for installation.
DONG Energy will support two PhD research studentships at Durham University through the Durham Energy Institute (DEI). The PhDs will focus on the operation of wind turbines and helping to predict technical faults before they happen.
The first of five wind turbines for the world’s first floating offshore wind farm – Hywind Scotland – has left the project’s assembly base in Stord, Norway, and is now on its way to the site off the coast of Peterhead in Aberdeenshire, Scotland.
Seaway Heavy Lifting has contracted FoundOcean for the grouting of the 84 wind turbine jacket foundations and two offshore transmission module (OTM) jackets at the Beatrice offshore wind farm, and has chosen BASF MasterFlow 9800 bulk-supplied grout.
Offshore wind moving forward with cutting down the cost of energy brings both a certain risk to the developers and pressure on the supply chain. The industry needs to stand together with a joint aim to further reduce the price of offshore wind power, according to Lars Kristensen, Senior Vice Preside
The U.S. National Renewable Energy Laboratory (NREL) will carry out a new survey to examine the feasibility of various potential offshore renewable energy resources in the Gulf of Mexico, primarily offshore wind.
Scottish Enterprise has announced that it is contributing GBP 11.7 million to the expansion of Aberdeen Harbour, in addition to a loan of up to GBP 175 million from the European Investment Bank and the support of up to GBP 11 million provided by Aberdeen City and Aberdeenshire Councils via the Aberd
Edition three of the Offshore WIND Magazine will boast an HR topic, including interviews with governmental bodies from three countries. Next to that Bent Christensen, Vice President Siemens Gamesa, will feature in the main interview and we will delve deeper into the future of ever-growing turbines w
SMST’s Telescopic Access Bridge M Serie – including flatrack and telescopic pedestal elevator system – has been installed on Van Oord’s offshore installation vessel Aeolus, deployed on the Walney Extension offshore wind project. The first landing took place on 24th June, after an installation period
Wind measurement experts, gathered at a seminar hosted by Leosphere in June, claimed LiDAR is becoming the clear choice for bankable offshore wind measurements, saving millions on costs.
Van Oord has awarded Seaproof Solutions with a contract for the supply of cable protection systems for the Norther offshore wind farm in Belgium.
Despite President Donald Trump’s pro-oil and gas stance and his decision to leave the Paris Climate Accord, there are some positive signs that US offshore wind is gaining momentum, Westwood Global Energy Group writes.
MARIN (Maritime Research Institute Netherlands) has tested an innovative concept for a floating mega island that could provide future-proof living and working space at sea for developing, generating, storing, and maintaining renewable energy, including offshore wind.