An 800MW offshore wind project is part of the Danish government’s coming energy proposal, the country’s Energy, Supply and Climate Minister Lars Christian Lilleholt was reported as saying.
The Ohio Power Siting Board (OPSB) is holding a second local hearing about Icebreaker Windpower’s proposed offshore wind farm in Lake Erie in Cleveland, US, on 19 July.
The first of the four jacket foundations has been installed at Ørsted’s Hornsea Project One wind farm site 120 kilometres off the coast of Yorkshire.
Most read news on Offshore WIND from 16 to 22 April 2018.
GeoSea has installed all of the transition pieces at the 396MW Merkur offshore wind farm in the German North Sea using A2SEA’s jack-up vessel Sea Challenger.
Liebherr-MCCtec Rostock GmbH marked the production start of the HLC, Liebherr’s biggest offshore crane, which will be mounted on DEME Group’s Orion, a next-generation offshore installation vessel.
EOLINK anchored and connected its 1/10 scale 12MW floating wind turbine prototype to the French grid on 19 April.
Belgium plans to open a second offshore wind zone which will allow the development of further 2GW of capacity post-2020, according to Belgium’s Secretary for the North Sea Philippe De Backer.
Sif has won a contract by Van Oord for the production of 77 monopiles for the Borssele III & IV offshore wind project in the Netherlands.
French floating LiDAR developer Akrocean has deployed a WINDSEA buoy at the Fécamp met mast as part of the type 2 validation process of the OWA Carbon Trust Roadmap.
The US Bureau of Ocean Energy Management (BOEM) is holding the New York Bight Renewable Energy Intergovernmental Task Force on 9 May in Newark, New Jersey.
The UK government should establish a new 60 percent UK content target for British offshore wind projects, according to former UK Energy Minister Michael Fallon.
Offshore wind developer Ørsted has signed Memorandums of Understanding (MoUs) respectively with Show Chwan Memorial Hospital and Changhua Christian Hospital in Taiwan to collaborate and build up a medical network for offshore wind farms.
Smulders loaded its 1,500th transition piece at the yard in Hoboken, Belgium, on Wednesday, 18 April, which is destined for the Hohe See offshore wind farm.