Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

All

Loading filters...
AuthoritiesFloating WindPlanning & PermittingProject UpdatesWind Farm UpdateCablesGrid ConnectionOutlook & StrategyVesselsContracts & TendersFixed-BottomOperations & MaintenanceSupply ChainEnvironmentFoundationsOffshore PlatformsCollaborationWind Turbines
California Moves to Sue Trump Administration, RWE Over Deal to Cancel Floating Wind Project
Authorities

California Moves to Sue Trump Administration, RWE Over Deal to Cancel Floating Wind Project

about 1 month ago
Jan De Nul’s First XL Cable Layer on Sea Trials, Second to Follow
Cables

Jan De Nul’s First XL Cable Layer on Sea Trials, Second to Follow

about 1 month ago
EWE Seeks Helicopter Transport Services for Riffgat Offshore Wind Farm
Contracts & Tenders

EWE Seeks Helicopter Transport Services for Riffgat Offshore Wind Farm

German company EWE, through Offshore-Windpark Riffgat GmbH, has launched a tender for helicopter services to support planned maintenance and unplanned repair and troubleshooting work at the Riffgat offshore wind farm in the German North Sea. The tender is divided into four lots, covering different h

about 1 month ago
First Monopile Installed at RWE and TotalEnergies’ Dutch Offshore Wind Farm
Environment

First Monopile Installed at RWE and TotalEnergies’ Dutch Offshore Wind Farm

about 1 month ago
Ørsted’s 920 MW Offshore Wind Project in Taiwan Enters Final Commissioning Phase
Fixed-Bottom

Ørsted’s 920 MW Offshore Wind Project in Taiwan Enters Final Commissioning Phase

about 1 month ago
Taiwan-Bound Subsea Construction Vessel on Its Way to Norway for Final Outfitting
Cables

Taiwan-Bound Subsea Construction Vessel on Its Way to Norway for Final Outfitting

about 1 month ago
Jasmund offshore platform at Windanker
Fixed-Bottom

Iberdrola’s New German Offshore Wind Farm Feeding Electricity into Grid

about 1 month ago
California Files Lawsuit Against Trump Administration, Golden State Wind Developer Over Cancelled Lease
Authorities

California Files Lawsuit Against Trump Administration, Golden State Wind Developer Over Cancelled Lease

about 1 month ago
TenneT Names Contractor for Annual Dutch Offshore Cable Integrity Surveys
Cables

TenneT Names Contractor for Annual Dutch Offshore Cable Integrity Surveys

TenneT Netherlands has selected compatriot survey company Deep to perform annual offshore cable integrity surveys between 2026 and 2029. Deep announced today, 31 August, that it would use hydrographic and geophysical techniques to determine the level of seabed cover above the cables, identify object

about 1 month ago
Half of Turbines Up at Nordseecluster A
Fixed-Bottom

Half of Turbines Up at Nordseecluster A

about 1 month ago
Acta Marine’s New CSOV Begins Charter at Sofia Offshore Wind Farm
Fixed-Bottom

Acta Marine’s New CSOV Begins Charter at Sofia Offshore Wind Farm

Acta Marine’s new construction service operation vessel (CSOV), Acta Gemini, has started operating at the Sofia offshore wind farm in the UK after the vessel completed its shakedown and mobilisation period. Under a long-term charter agreement with RWE, Acta Gemini will provide offshore accommodation

about 1 month ago
IJmuiden Ver Beta jacket element
Fixed-Bottom

Jacket for TenneT’s IJmuiden Ver Beta Platform Starts Taking Shape

Heerema Fabrication Group has completed the first structural element for the jacket foundation for TenneT’s 2 GW IJmuiden Ver Beta transformer platform at its yard in Vlissingen. During the first so-called roll-up, the 1,700-tonne steel element was lifted from a horizontal position into a controlled

about 1 month ago
913 MW German Offshore Wind Farm Commissioned
Fixed-Bottom

913 MW German Offshore Wind Farm Commissioned

about 1 month ago
Seaway Alfa Lift to Start Installing Inch Cape Jacket Pin Piles, Cadeler’s Wind Mover to Begin Turbine Installation in November
Fixed-Bottom

Seaway Alfa Lift to Start Installing Inch Cape Jacket Pin Piles, Cadeler’s Wind Mover to Begin Turbine Installation in November

Seaway7 is set to begin installing the pin piles for the jacket foundations at the 1.1 GW Inch Cape offshore wind farm in Scotland, according to a Notice to Mariners issued by Inch Cape Offshore Limited. Meanwhile, the project’s wind turbine components have been arriving at the Port of Dundee ahead

about 1 month ago
  • 1
  • …
  • 10
  • 11
  • 12
  • …
  • 2960