Advertisement

Ports & Logistics

about 4 years ago

First Mediterranean Sea Wind Turbine Rises – Gallery

Van Oord’s jack-up MPI Resolution has started installing wind turbines at the 30 MW Taranto wind farm offshore Italy, the first wind farm to be built in the Mediterranean Sea. In the photos provided by Renexia SpA, the developer of the wind farm, MPI Resolution is seen installing the first of the te

1 minutes read
First Mediterranean Sea Wind Turbine Rises – Gallery
Renexia SpA

Van Oord’s jack-up MPI Resolution has started installing wind turbines at the 30 MW Taranto wind farm offshore Italy, the first wind farm to be built in the Mediterranean Sea.

In the photos provided by Renexia SpA, the developer of the wind farm, MPI Resolution is seen installing the first of the ten MySE 3.0-135 wind turbines provided by MingYang Smart Energy.

The same jack-up completed the installation of the wind farm’s ten monopile foundations last month.

The Taranto offshore wind farm, also known as Beleolico , is located in Italy’s Apulia Region near the Taranto harbour.

The wind farm is scheduled to be fully commissioned in 2022 and provide about 55,600 MWh of electricity per year, enough to meet the demand of around 18,500 households, according to Renexia.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.