Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Contracts & TendersVesselsGrid ConnectionAuthoritiesBusiness & Finance
A photo of a GE Haliade-X wind turbine
Wind Farm Update

K2 Management to Provide Construction Monitoring for Dogger Bank A & B

K2 Management has been awarded a four-year contract for construction monitoring on the first two phases of the 3.6 MW Dogger Bank offshore wind farm, Dogger Bank A and Dogger Bank B. The construction monitoring for the project began in late 2020 and will run until Dogger Bank A & B start commercial

about 5 years ago
Moray East
Wind Farm Update

Bold Tern Completes First Moray East Run

Fred. Olsen Windcarrier’s jack-up Bold Tern has returned to Port of Nigg after installing the first four Vestas (MHI Vestas) 9.5 MW wind turbines at the Moray East wind farm off Scotland. The 950 MW Moray East will feature 100 V164-9.5MW units installed at the site some 22 kilometres off the Aberdee

about 5 years ago
Hornsea Two Hybrid CTVs Getting Closer to Delivery
Wind Farm Update

Hornsea Two Hybrid CTVs Getting Closer to Delivery

Ørsted is set to welcome three new hybrid crew transfer vessels (CTVs) to assist with the construction at the Hornsea Two offshore wind farm. Northern Offshore Services (N-O-S) will take delivery of its 39m Energizer in the spring and MHO-Co is due to deliver its two 35m CTVs in the summer. The vess

about 5 years ago
First wind turbine standing at the Triton Knoll project site
Wind Farm Update

First Wind Turbine Up at Triton Knoll OWF

The first of the total of 90 offshore wind turbines has been installed at the Triton Knoll offshore wind farm site, located some 32 kilometres offshore Lincolnshire, UK. The wind farm is expected to generate first power this Spring, according to RWE. The 9.5 MW MHI Vestas wind turbines are being ins

about 5 years ago
Triton Knoll Enters Wind Turbine Installation Phase
Wind Farm Update

Triton Knoll Enters Wind Turbine Installation Phase

Cadeler’s wind farm installation vessel Wind Osprey has arrived at the Triton Knoll wind farm loaded with the first sets of MHI Vestas V164-9.5 MW turbines. The installation of the first wind turbine at the site some 32 kilometres offshore Lincolnshire, UK, is ongoing. Wind Osprey loaded the turbine

about 5 years ago
Rampion 2 Team Starts Informal Consultation
Wind Farm Update

Rampion 2 Team Starts Informal Consultation

The Rampion 2 team has launched a four-week informal consultation this week to raise awareness and seek feedback on their initial proposals to expand the Rampion wind farm off the Sussex coast, UK. A full and formal consultation will follow later in the year, ahead of the submission of a development

about 5 years ago
Wind Osprey Ready for Triton Knoll Turbines
Wind Farm Update

Wind Osprey Ready for Triton Knoll Turbines

Cadeler has mobilized and handed over its jack-up vessel Wind Osprey for the installation of turbines at the Triton Knoll offshore wind project in the UK. The jack-up is now in Able Seaton Port where load out operations will take place for the duration of the project. According to Cadeler, the vesse

about 5 years ago
Hornsea Two Onshore Cables In Place
Wind Farm Update

Hornsea Two Onshore Cables In Place

VolkerInfra has completed the onshore cable installation for the Hornsea Two offshore wind project in the UK. VolkerInfra installed a total of 350 km of cable over 39 km of Lincolnshire land, reaching from the wind farm’s landfall point at Horseshoe Point to North Killingholme. Reinstatement works a

about 5 years ago
Image showing a map positioning Hornsea Project Three in the Hornsea Zone offshore the UK
Wind Farm Update

UK Gives Go-Ahead to Hornsea Three Offshore Wind Farm

The UK Secretary of State for Business, Energy and Industrial Strategy (BEIS) gave the development consent to the Hornsea Project Three offshore wind farm on 31 December 2020. Ørsted submitted the development consent order (DCO) application for the 2.4 GW project to the UK Planning Inspectorate on 1

about 5 years ago
Ofgem Selects Preferred East Anglia ONE Transmission Operator
Wind Farm Update

Ofgem Selects Preferred East Anglia ONE Transmission Operator

UK energy market regulator Ofgem has named Transmission Capital Partners the preferred offshore transmission owner (OFTO) for the 714 MW East Anglia ONE offshore wind farm. Transmission Capital Partners is a consortium of Transmission Capital Partners Limited Partnership and International Public Par

about 5 years ago
Esvagt Njord Crew Rescues Injured Fishermen
Wind Farm Update

Dudgeon Crew Rescues Injured Fishermen

The crew of the Esvagt Njord Service Operations Vessel, in cooperation with Equinor’s medic and technicians, rescued seven fishermen in distress near the Dudgeon wind farm offshore the UK. Esvagt Njord is a wind turbine ship assisting Equinor in the operation of the Dudgeon wind farm off Great Yarmo

about 5 years ago
14 MW GE Haliade-X for Third Phase of World’s Largest Offshore Wind Farm
Wind Farm Update

14 MW GE Haliade-X for Third Phase of World’s Largest Offshore Wind Farm

GE Renewable Energy has secured a preferred turbine supplier contract to provide its 14 MW Haliade-X turbine for the third phase of the Dogger Bank offshore wind project. The 14 MW Haliade-X is an upscaled version of the 13 MW unit which will be installed at Dogger Bank A & B, and Dogger Bank C [&he

about 5 years ago
E.ON Taps RWE for More Offshore Wind Power
Wind Farm Update

E.ON Taps RWE for More Offshore Wind Power

RWE Renewables has signed a Power Purchase Agreement (PPA) with E.ON UK for the electricity produced by the Humber Gateway offshore wind farm in the UK. E.ON UK will offtake 100% of the project’s electricity from 2022 until 2035, which also includes the Renewable Obligation Certificates (ROCs). The

about 5 years ago
Van Oord's offshore installation vessel Aeolus
Wind Farm Update

Van Oord to Install Monopiles, Inter-Array Cables at Sofia Offshore Wind Farm

RWE has selected Van Oord as the preferred supplier for the engineering, procurement, construction and installation (EPCI) of monopile foundations and array cables for the 1.4 GW Sofia offshore wind project in the UK. Van Oord will deploy its offshore installation vessel Aeolus to install the 100 TP

about 5 years ago
  • 1
  • …
  • 49
  • 50
  • 51
  • …
  • 68