Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Fixed-BottomFoundationsProject UpdatesSupply ChainGrid ConnectionOffshore PlatformsPlanning & PermittingCablesVesselsBusiness developmentResearch & DevelopmentBusiness & FinanceWind Turbines
Sofia monopiles EEW SPC
Wind Farm Update

EEW SPC Ships Final Monopiles for RWE’s Sofia Offshore Wind Farm

The last three monopiles for RWE’s Sofia offshore wind farm in the UK have been loaded at the quay of EEW Special Pipe Constructions (EEW SPC) in Rostock, Germany. According to EEW SPC, a total of 100 monopiles, with weights of 1,143 to 1,521 tonnes and lengths of up to 91.8 metres, were loaded onto

about 1 year ago
Aibel Hornsea 3 converter station
Wind Farm Update

Hornsea 3 Offshore Converter Station Topside Arrives in Norway for Final Outfitting

The first of two offshore converter station topsides for Ørsted’s Hornsea 3 offshore wind farm has arrived in Haugesund, Norway. The converter station topside began its journey from Thailand to Norway in April 2025, where it will undergo final outfitting and commissioning. The platform is scheduled

about 1 year ago
SSE, Equinor Expected to Submit Dogger Bank D DCO Application in Summer 2026
Wind Farm Update

SSE, Equinor Expected to Submit Dogger Bank D DCO Application in Summer 2026

Statutory consultation for the Dogger Bank D offshore wind farm will open on 10 June, as the co-owners of the project, SSE Renewables and Equinor, are working towards applying for development consent. According to information on the UK Planning Inspectorate’s website, the application for a Developme

about 1 year ago
NKT Begins Export Cable Installation Activities at Dogger Bank A
Wind Farm Update

Export Cable Installation to Start at East Anglia Three

NKT, using its vessel NKT Victoria, is scheduled to start installing the export cable for the 1.4 GW East Anglia Three offshore wind farm in the UK this month. The vessel is expected to mobilise from the port of Karlskrona in Sweden on 14 June and work on the East Anglia Three site 24/7, conducting

about 1 year ago
An image showing Hornsea Three array site and export cable corridor on a map
Wind Farm Update

Ørsted Preparing Seabed for Hornsea Three Export Cable

Preparation work for the installation of the Hornsea Three export cable is underway with boulder and debris relocation, and a geophysical survey starting this month, following the completion of UXO clearance work. An installation campaign to replace blanking plates from the horizontal directional dr

about 1 year ago
Seaway Alfa Lift Moves Onto Dogger Bank C Transition Piece Installation
Wind Farm Update

Seaway Alfa Lift Moves Onto Dogger Bank C Transition Piece Installation

Heavy lift vessel (HLV) Seaway Alfa Lift, which recently completed the installation of transition pieces (TPs) at Dogger Bank B, has started the same work at the Dogger Bank C offshore wind site in the UK. According to the latest Notice of Operations for Dogger Bank C from Dogger Bank Wind Farm, the

about 1 year ago
Fugro to Perform Geotechnical Survey at Morgan and Mona Offshore Wind Sites
Wind Farm Update

Fugro to Perform Geotechnical Survey at Morgan and Mona Offshore Wind Sites

Fugro will carry out an offshore geotechnical survey at the Morgan and Mona offshore wind sites in the UK, starting on or around 2 June. Using its geotechnical drilling vessel Fugro Synergy, the company will be drilling, sampling and coring boreholes throughout the array areas, with the works estima

about 1 year ago
Dogger Bank C substation platform
Wind Farm Update

Final Dogger Bank Wind Farm Offshore Substation Installed

The jacket foundation and the topside for Dogger Bank C, the third phase of the 3.6 GW Dogger Bank Wind Farm, have been installed in the UK. According to the recent Notice to Mariners from the project, Heerema Marine Contractors’ semi-submersible crane vessel Sleipnir installed the jacket foundation

about 1 year ago
Seaway Alfa Lift Installs Final Transition Piece at Dogger Bank B
Wind Farm Update

Seaway Alfa Lift Installs Final Transition Piece at Dogger Bank B

All foundations, including the transition pieces (TPs), are now in place at Dogger Bank B, the second phase of the world’s largest offshore wind farm under construction, as the heavy-lift vessel (HLV) Seaway Alfa Lift recently installed the final TP. The vessel started installing the final five TPs

about 1 year ago
Geoquip Marine Germany
Wind Farm Update

Geoquip Marine Wraps Up Survey Work for Two Offshore Wind Projects in Germany

Geoquip Marine has completed a preliminary geotechnical site investigation for two 4 GW offshore wind projects in the German North Sea. Under the contract, the UK-based company drilled 28 boreholes across the project sites to analyse the subsea terrain for wind turbine foundations. Geoquip underwent

about 1 year ago
Wind Peak WTIV installing the first wind turbine at Sofia offshore wind farm
Wind Farm Update

RWE Mulls Stake Sale in 1.4 GW Sofia Offshore Wind Farm

RWE plans to sell a stake in its 1.4 GW Sofia offshore wind farm next year, which is currently under construction in the UK. In a press conference call speech published on 15 May, Michael Müller, CFO of RWE AG, said that the company intends to sell stakes in the Sofia offshore wind project next [&he

about 1 year ago
Wind Peak WTIV installing the first wind turbine at Sofia offshore wind farm
Wind Farm Update

11 Turbines, 76 Foundations In Place at Sofia Offshore Wind Farm

Eleven wind turbines are now standing tall at the Sofia offshore wind farm site in the UK, where the work started in March and will continue until the end of the year. Foundation installation is also underway at the UK project site, with 76 monopile foundations now in place. The 1.4 GW project, deve

about 1 year ago
An image showing a map of Hornsea offshore wind projects with Hornsea 4 highlighted
Wind Farm Update

Ørsted Pulls Plug on 2.4 GW Hornsea 4 Offshore Wind Project in UK

Ørsted has discontinued the development of the UK’s Hornsea 4 offshore wind farm in its current form. The developer said the 2.4 GW project has faced rising supply chain costs, higher interest rates, and increased construction and delivery risks since the Contract for Difference (CfD) award in Alloc

about 1 year ago
Dogger Bank HVDC Substation
Wind Farm Update

Installation of Offshore Substation About to Start at Dogger Bank C Site

The installation of the offshore substation jacket foundation and topside for the third phase of the Dogger Bank Wind Farm, the world’s biggest offshore wind farm under construction, will commence soon. Heerema Marine Contractors’ semi-submersible crane vessel (SSCV) Sleipnir will install the offsho

about 1 year ago
  • 1
  • …
  • 11
  • 12
  • 13
  • …
  • 68