Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Supply Chain

Loading filters...
FeaturedHeadlinesBusiness & FinanceFloating WindFoundationsProject UpdatesWind Farm UpdateContracts & TendersFixed-BottomPorts & LogisticsAuthoritiesPlanning & PermittingWind TurbinesInfrastructureManufacturingBusiness developmentResearch & DevelopmentVesselsCablesGrid Connection
Cierco Energy, MPS Enter Partnership for Celtic Sea Floating Wind Demo Project
Supply Chain

Cierco Energy, MPS Enter Partnership for Celtic Sea Floating Wind Demo Project

Cierco Energy and Marine Power Systems (MPS) have signed a Memorandum of Understanding (MoU), which is said to be the first step towards deploying MPS PelaFlex technology at one of the Llŷr demonstration project sites in the Celtic Sea. Cierco Energy was chosen to build the Llŷr 1 and Llŷr 2 floatin

about 1 year ago
Ørsted Selects Construction Base for Hornsea 3 Offshore Wind Farm
Supply Chain

Ørsted Selects Construction Base for Hornsea 3 Offshore Wind Farm

Ørsted has selected Steel River Quay on the Teesworks site on the south bank of the River Tees in the northeast of England as the construction base for the Hornsea 3 offshore wind farm. Ørsted signed a lease agreement for up to 300,000 square metres at Steel River Quay, which will be used to collect

about 1 year ago
Cadeler Huisman A-Class vessels
Supply Chain

Ørsted’s Contract with Cadeler for Wind Farm Installation Vessel Terminated

Denmark’s Cadeler has received a notice of termination from Ørsted in relation to the long-term agreement for one of its wind farm installation vessels. A long-term charter agreement for an A-Class wind farm installation vessel was disclosed by Ørsted on April 8, 2024, securing operational capacity

about 1 year ago
US Warns UK Over Mingyang’s Proposed Wind Turbine Factory, Chinese Analyst Says National Security Concerns ‘Guise for Protectionism’ – Reports
Supply Chain

US Warns UK Over Mingyang’s Proposed Wind Turbine Factory, Chinese Analyst Says National Security Concerns ‘Guise for Protectionism’ – Reports

The Trump administration has warned the UK government about security risks as Mingyang Smart Energy plans to build a factory in Scotland to manufacture wind turbines for North Sea offshore wind farms, according to a report by the Financial Times, citing a US official. A Chinese analyst has commented

about 1 year ago
A photo of an offshore wind farm on a calm day at sea
Supply Chain

Equinor, EDF-ESB Joint Venture Secure 1.5 GW Sites in UK Floating Wind Leasing Round

The Crown Estate has selected Equinor and Gwynt Glas, a joint venture between EDF Renewables UK and ESB, as preferred bidders in the seabed leasing round for floating wind projects in the Celtic Sea. Selected on 12 June, each of the two developers was awarded 1.5 GW of capacity in their respective p

about 1 year ago
Sofia monopiles EEW SPC
Supply Chain

EEW SPC Ships Final Monopiles for RWE’s Sofia Offshore Wind Farm

The last three monopiles for RWE’s Sofia offshore wind farm in the UK have been loaded at the quay of EEW Special Pipe Constructions (EEW SPC) in Rostock, Germany. According to EEW SPC, a total of 100 monopiles, with weights of 1,143 to 1,521 tonnes and lengths of up to 91.8 metres, were loaded onto

about 1 year ago
Crown Estate to Invest GBP 350 Million in Construction of New Port, Supply Chain Infrastructure for UK Offshore Wind
Supply Chain

Crown Estate to Invest GBP 350 Million in Construction of New Port, Supply Chain Infrastructure for UK Offshore Wind

The Crown Estate is setting up a new Supply Chain Investment Programme worth GBP 350 million (approximately EUR 410 million) to invest in the construction of new port and supply chain infrastructure that will support accelerated delivery of UK offshore wind projects, the UK seabed manager said on 17

about 1 year ago
Bowdun Offshore Scoping report
Supply Chain

OWC, Empire Engineering Win Work on TWP’s Scottish Offshore Wind Farms

Renewable energy consultancy OWC and Empire Engineering have been selected to provide owner’s engineering services for the 1 GW Ayre and 1 GW Bowdun offshore wind farms in Scotland. The companies will support Thistle Wind Partners (TWP), a consortium of DEME, Qair, and Aspiravi, from concept selecti

about 1 year ago
Seaway Alfa Lift Moves Onto Dogger Bank C Transition Piece Installation
Supply Chain

Seaway Alfa Lift Moves Onto Dogger Bank C Transition Piece Installation

Heavy lift vessel (HLV) Seaway Alfa Lift, which recently completed the installation of transition pieces (TPs) at Dogger Bank B, has started the same work at the Dogger Bank C offshore wind site in the UK. According to the latest Notice of Operations for Dogger Bank C from Dogger Bank Wind Farm, the

about 1 year ago
Seaway Alfa Lift Installs Final Transition Piece at Dogger Bank B
Supply Chain

Seaway Alfa Lift Installs Final Transition Piece at Dogger Bank B

All foundations, including the transition pieces (TPs), are now in place at Dogger Bank B, the second phase of the world’s largest offshore wind farm under construction, as the heavy-lift vessel (HLV) Seaway Alfa Lift recently installed the final TP. The vessel started installing the final five TPs

about 1 year ago
Wind Peak WTIV installing the first wind turbine at Sofia offshore wind farm
Supply Chain

11 Turbines, 76 Foundations In Place at Sofia Offshore Wind Farm

Eleven wind turbines are now standing tall at the Sofia offshore wind farm site in the UK, where the work started in March and will continue until the end of the year. Foundation installation is also underway at the UK project site, with 76 monopile foundations now in place. The 1.4 GW project, deve

about 1 year ago
Tekmar Secures Grouting Contract for 1.1 GW Scottish Offshore Wind Farm
Supply Chain

Tekmar Secures Grouting Contract for 1.1 GW Scottish Offshore Wind Farm

UK-based Tekmar Group has been awarded a contract to provide grouting services for the 1.1 GW Inch Cape offshore wind farm in Scotland. Under the contract, Tekmar Group will deliver a specialist grouting solution for key offshore wind infrastructure. The work is scheduled to commence in September 20

about 1 year ago
TGS, Fugro Sign Survey Deals with RWE, Masdar for Dogger Bank South East Site
Supply Chain

TGS, Fugro Sign Survey Deals with RWE, Masdar for Dogger Bank South East Site

RWE and Masdar have signed contracts with TGS and Fugro to conduct detailed geophysical and geotechnical surveys for the eastern array of the proposed Dogger Bank South (DBS) offshore wind farms. According to the developers, these site investigations will enhance understanding of the seabed conditio

about 1 year ago
Gwynt y Môr N-Sea cable repair
Supply Chain

N-Sea Lands Another Cable Repair Contract for 576 MW Gwynt y Môr Offshore Wind Farm

The Dutch company, N-Sea Group, has been awarded a contract to repair one of the four export cables that connect the 576 MW Gwynt y Môr offshore wind farm in the UK to the National Grid. N-Sea will be responsible for replacing a five-kilometre section of 132 kV export cable from the onshore transiti

about 1 year ago
  • 1
  • …
  • 6
  • 7
  • 8
  • …
  • 16