Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Foundations

Loading filters...
FeaturedHeadlinesFixed-BottomProject UpdatesSupply ChainWind Farm UpdateVesselsEquipmentManufacturingBusiness & FinanceFloating WindWind TurbinesInnovationTechnologyBusiness development
Navantia and Windar Complete East Anglia Three Monopiles
Foundations

Navantia and Windar Complete East Anglia Three Monopiles

The business alliance formed by Navantia Seanergies and Windar Renovables has completed the manufacturing of 45 monopiles for the East Anglia THREE offshore wind farm, developed by Iberdrola in the UK North Sea. The Navantia-Windar consortium is delivering 45 monopiles for the 1.4 GW East Anglia Thr

about 9 months ago
All 277 Monopile Foundations Installed at 3.6 GW Dogger Bank Wind Farm
Foundations

All 277 Monopile Foundations Installed at 3.6 GW Dogger Bank Wind Farm

Seaway7 has installed the last of the total of 277 transition pieces (TPs) on Dogger Bank Wind Farm, the 3.6 GW offshore wind project in the UK North Sea, marking the completion of all foundation installation work. The company’s heavy-lift vessel, Seaway Alfa Lift, started TP transport and installat

about 10 months ago
Haizea Hornsea 3 monopile
Foundations

Haizea Rolls Out First Monopile for Ørsted’s Hornsea 3 Offshore Wind Farm

Spain’s Haizea Wind Group has rolled out the first monopile for Ørsted’s 2.9 GW Hornsea 3 offshore wind farm in the UK. The monopile will now undergo its surface treatment before being shipped to the offshore wind farm project, located approximately 120 kilometres off the Norfolk Coast in the North

about 1 year ago
SeAH Wind Hornsea 3
Foundations

Hornsea 3 Monopile Production Begins at SeAH Wind’s New UK Facility

SeAH Wind has commenced commercial production for its inaugural project, delivering monopile foundations for Ørsted’s 2.9 GW Hornsea 3 offshore wind farm in the UK. The milestone was marked by cutting the first steel plates. This signifies the beginning of operations at SeAH Wind’s facility on Teess

about 1 year ago
Cierco Energy, MPS Enter Partnership for Celtic Sea Floating Wind Demo Project
Foundations

Cierco Energy, MPS Enter Partnership for Celtic Sea Floating Wind Demo Project

Cierco Energy and Marine Power Systems (MPS) have signed a Memorandum of Understanding (MoU), which is said to be the first step towards deploying MPS PelaFlex technology at one of the Llŷr demonstration project sites in the Celtic Sea. Cierco Energy was chosen to build the Llŷr 1 and Llŷr 2 floatin

about 1 year ago
Sofia monopiles EEW SPC
Foundations

EEW SPC Ships Final Monopiles for RWE’s Sofia Offshore Wind Farm

The last three monopiles for RWE’s Sofia offshore wind farm in the UK have been loaded at the quay of EEW Special Pipe Constructions (EEW SPC) in Rostock, Germany. According to EEW SPC, a total of 100 monopiles, with weights of 1,143 to 1,521 tonnes and lengths of up to 91.8 metres, were loaded onto

about 1 year ago
Seaway Alfa Lift Moves Onto Dogger Bank C Transition Piece Installation
Foundations

Seaway Alfa Lift Moves Onto Dogger Bank C Transition Piece Installation

Heavy lift vessel (HLV) Seaway Alfa Lift, which recently completed the installation of transition pieces (TPs) at Dogger Bank B, has started the same work at the Dogger Bank C offshore wind site in the UK. According to the latest Notice of Operations for Dogger Bank C from Dogger Bank Wind Farm, the

about 1 year ago
Seaway Alfa Lift Installs Final Transition Piece at Dogger Bank B
Foundations

Seaway Alfa Lift Installs Final Transition Piece at Dogger Bank B

All foundations, including the transition pieces (TPs), are now in place at Dogger Bank B, the second phase of the world’s largest offshore wind farm under construction, as the heavy-lift vessel (HLV) Seaway Alfa Lift recently installed the final TP. The vessel started installing the final five TPs

about 1 year ago
Wind Peak WTIV installing the first wind turbine at Sofia offshore wind farm
Foundations

11 Turbines, 76 Foundations In Place at Sofia Offshore Wind Farm

Eleven wind turbines are now standing tall at the Sofia offshore wind farm site in the UK, where the work started in March and will continue until the end of the year. Foundation installation is also underway at the UK project site, with 76 monopile foundations now in place. The 1.4 GW project, deve

about 1 year ago
Bubble Curtain Used for First Time in UK as RWE Deploys Noise Abatement Tech at Sofia Offshore Wind Farm
Foundations

Bubble Curtain Used for First Time in UK as RWE Deploys Noise Abatement Tech at Sofia Offshore Wind Farm

RWE, in collaboration with Hydrotechnik Offshore, a Germany-based bubble curtain developer, has deployed the underwater noise abatement technology during monopile installation at the Sofia offshore wind farm, marking the first time the technology has been used in the UK. Currently under construction

about 1 year ago
Dogger Bank A final TP
Foundations

Seaway Strashnov to Install Last Two Dogger Bank B Monopiles in April

The offshore installation vessel Seaway Strashnov will install the remaining two monopiles at the Dogger Bank B offshore wind farm site next month. According to a Notice to Mariners from the project, the work is planned to commence on 7 April and continue until approximately 30 April. The heavy lift

about 1 year ago
Foundation Installation to Soon Begin on 1.4 GW UK Offshore Wind Farm
Foundations

Foundation Installation to Soon Begin on 1.4 GW UK Offshore Wind Farm

Seaway7, using the jack-up vessel Seaway Ventus, is scheduled to start installing wind turbine foundations at the East Anglia Three offshore wind farm site at the beginning of April. Seaway Ventus is expected to mobilise at BOW Terminal in the Netherlands on 27 March and commence offshore work withi

about 1 year ago
ABL’s Longitude Launches Offshore Wind Foundation Design Division
Foundations

ABL’s Longitude Launches Offshore Wind Foundation Design Division

ABL Group has established a business unit specialising in offshore wind foundation design. The new unit will be part of Longitude, the Group’s design and engineering arm. The foundation design division will bring together multi-disciplined engineering and offshore wind foundation design expertise fr

about 1 year ago
A photo of Navantia-Harland & Wolff team at Harland & Wolff's shipyard in Belfast
Foundations

Navantia Takes Over Harland & Wolff

Navantia UK has acquired the British shipbuilder Harland & Wolff and its operations across four sites: Belfast in Northern Ireland, Appledore in the South West of England, and Methil and Arnish in Scotland. The British subsidiary of the Spanish shipbuilder and offshore wind foundation manufacturer r

about 1 year ago
  • 1
  • 2
  • 3
  • 4
  • 5