
China, the UK, and the U.S. will be the main contributors to the new offshore wind capacity added globally by 2030, with China’s new offshore wind farms to account for 25 per cent of the globally installed capacity. “China is poised to dominate due to its conducive policy initiatives and presence of

Offshore Renewable Energy (ORE) Catapult and Advance Northumberland have established a partnership to develop a new facility for testing the next generation of offshore wind turbines. The Energy Central Offshore Wind Demonstrator will be designed to host one large prototype turbine for testing and w

The UK government has awarded a floating wind project led by Wave Hub with early-stage funding that could result in a further longer-term investment of later this year if the early stage of the project development is successful. The South West Floating Offshore Wind Accelerator is one of 17 projects

ABPmer has been commissioned to complete the physical process impact assessment in support of the Development Consent Order Application for the Erebus floating wind farm offshore Wales. Blue Gem Wind, the joint venture between Simply Blue Energy and Total, is developing floating offshore wind sites

North East England’s offshore wind cluster, Energi Coast, is starting a project which aims to produce a comprehensive report of the region’s supply chain capabilities in the offshore wind industry. The supply chain mapping project will identify the range of capabilities available throughout North Ea

The offshore wind farms that won the Contracts for Difference (CfDs) in the latest UK CfD round will most likely be the first to operate with “negative subsidies”, even before the zero-subsidy projects awarded in auctions in the Netherlands and Germany. According to an analysis by an international t

Ørsted has joined a GBP 400,000 sea state forecasting project, launched by UK’s national Operations & Maintenance (O&M) Centre of Excellence, a collaboration between the University of Hull and the Offshore Renewable Energy (ORE) Catapult. The project’s goal is to deliver a significant reduction in m

The Carbon Trust sees 70 GW of floating wind installed capacity by 2040, according to a new summary report on the findings from the second phase of the Floating Wind Joint Industry Project (JIP). The report outlines technology challenges that need to be addressed so the commercialisation of floating

The Carbon Trust has launched four new tenders as part of its Offshore Wind Accelerator (OWA) programme. The first two tenders are related to monopile foundations, with the first calling for entries from interested parties to undertake a study to investigate monopile driveability through vibratory p

The two-year, Innovate UK-funded MIMRee (Multi-Platform Inspection, Maintenance and Repair in Extreme Environments) project has revealed breakthroughs achieved during its first year. The MIMRee project has made concrete steps toward reaching its ultimate goal of having an autonomous system capable o

Researchers at the University of Birmingham are developing a ‘smart’ system that uses wind turbines to defend a national grid from power cuts. The system that controls the storage and release of energy from wind turbines will reduce the risk of power cuts and support the increase of wind energy use

UK-based Bibby Marine Services (Bibby) has received a grant to explore a range of zero-carbon fuel systems through the WaveMaster Zero C Research and Development Project. The project will be supported by a grant from MarRI-UK, a collaborative innovation vehicle for UK industry and academia to jointl

The BladeBUG inspect-and-repair robot for offshore wind turbine blades has completed the latest round of testing at Offshore Renewable Energy (ORE) Catapult’s National Renewable Energy Centre in Blyth, the UK. During the trials that took place in early March, the robot walked on blade surfaces, prov

The Offshore Renewable Energy (ORE) Catapult’s centre in Blyth has resumed testing and validation activity after a pause of some ten days. ORE Catapult had suspended access to the Blyth site for approximately 10 days to implement COVID-19-related protocols and measures. During that time, engineering