Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Fugro Wins East Anglia Two Post-Installation Survey Contract
Contracts & Tenders

November 4, 2026 · 1 minute ago

Fugro Wins East Anglia Two Post-Installation Survey Contract

AB

Adrijana Buljan

Offshore Wind

1 minutes read
  • LinkedIn
  • X
  • Email
An offshore wind farm in the North Sea
An offshore wind farm in the North Sea; Source: Fugro

Fugro has secured a contract from Cadeler to carry out post-installation seabed surveys at the 960 MW East Anglia Two offshore wind farm in the UK, with work scheduled to begin in early 2027.

The company will deploy its FCV 600 work-class remotely operated vehicle (ROV) from a Cadeler installation vessel to inspect 64 monopile foundation locations. The surveys will verify that the foundations have been installed as planned and provide data to support quality assurance and assessment of their long-term integrity.

Cadeler is responsible for transporting and installing all 64 monopile foundations and wind turbines at East Anglia Two. The company will use its newbuild A-class vessel Wind Ace alongside an O-class vessel for the installation campaign.

Related Articles

Vessels

Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two

2 min read

East Anglia Two is being developed by ScottishPower Renewables, part of the Iberdrola Group, approximately 33 kilometres off the Suffolk coast.

The 960 MW project will comprise 64 Siemens Gamesa SG 14-236 DD turbines and is expected to enter commercial operation in late 2028.

Fugro is also providing positioning and construction services to Cadeler at Ørsted’s 2.9 GW Hornsea 3 offshore wind farm, where its specialists aboard Cadeler’s Wind Ally installation vessel are using the company’s InclinoCam technology to measure the tilt and vertical alignment of monopile foundations during installation, according to the company.

Related Articles

Fixed-Bottom

First Monopile Installed at Hornsea 3 Offshore Wind Farm

1 min read

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Contracts & TendersBusiness & FinanceContracts & TendersProject UpdatesProject UpdatesWind Farm UpdateFixed-Bottom

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free