offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Long Reads›What Title
Long Reads

July 1, 2026 · about 2 months ago

What Title

Naval Article jhshd https://www.youtube.com/watch?v=CDTu9md6ukM Read

2 minutes read
  • LinkedIn
  • X
  • Email
a testing image
some testing captionpictured by David. Malaysia

Naval Article

Spanish shipbuilding company Navantia has begun testing of the air-independent propulsion system (AIP) incorporated into the section of the Spanish Navy’s submarine S-83 Cosme García, the third unit in the S80 series.

The section of S83 carrying the AIP is located in a special test facility at the Cartagena shipyard, known as IPS3, where a multidisciplinary task force from the Submarine Business has carried out all the necessary checks to begin testing.

These final tests are starting after all prior installation work on the various pieces of equipment required for their proper execution has been completed.

According to Navantia, the tests will make it possible to carry out the necessary adjustments to the system in its actual location before joining the 12-meter-long, approximately 400-ton section to the rest of the submarine’s pressure hull.

Testing of the AIP in its section has begun with the first loading of liquid oxygen and bioethanol, from which the system produces hydrogen to fuel its hydrogen fuel cell and propel the submari


Spanish shipbuilding company Navantia has begun testing of the air-independent propulsion system (AIP) incorporated into the section of the Spanish Navy’s submarine S-83 Cosme García, the third unit in the S80 series.

The section of S83 carrying the AIP is located in a special test facility at the Cartagena shipyard, known as IPS3, where a multidisciplinary task force from the Submarine Business has carried out all the necessary checks to begin testing.

These final tests are starting after all prior installation work on the various pieces of equipment required for their proper execution has been completed.

According to Navantia, the tests will make it possible to carry out the necessary adjustments to the system in its actual location before joining the 12-meter-long, approximately 400-ton section to the rest of the submarine’s pressure hull.

Testing of the AIP in its section has begun with the first loading of liquid oxygen and bioethanol, from which the system produces hydrogen to fuel its hydrogen fuel cell and propel the submari


Ayre project team at Kirkwall Harbour

Ayre floating wind farm_Kirkwall Habour

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Long Reads

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Pacifico Energy Unveils EUR 860+ Million Investment in Two Offshore Wind Projects in South Korea
  2. 2Fourth Vard-Built CSOV Joins Windward Offshore Fleet
  3. 3ABS to Support Japanese Company’s 18 MW Floating Wind Turbine Pilot in Brazil
  4. 4Equinor to Deploy Cable Monitoring Tech at 9-Year-Old Offshore Wind Farm

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free