offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Featured›Ørsted Picks Marshalling Port for Hornsea 3 Offshore Wind Farm
Featured

September 25, 2025 · about 11 months ago

Ørsted Picks Marshalling Port for Hornsea 3 Offshore Wind Farm

Ørsted has chosen the Port of Tyne’s Tyne Clean Energy Park in South Shields as the marshalling base for its 2.9 GW Hornsea 3 offshore wind farm in the UK. The Denmark-headquartered Cadeler will use the 100,000-square-metre site to marshal secondary steel components for the offshore wind farm before

2 minutes read
  • LinkedIn
  • X
  • Email
Ørsted Port of Tyne
Source: Ørsted

Share this article

Ørsted has chosen the Port of Tyne’s Tyne Clean Energy Park in South Shields as the marshalling base for its 2.9 GW Hornsea 3 offshore wind farm in the UK.

The Denmark-headquartered Cadeler will use the 100,000-square-metre site to marshal secondary steel components for the offshore wind farm before each unit is loaded onto the Wind Orca ahead of setting off to the Hornsea 3 site.

Severfield, a UK structural steel contractor, and Smulders will fabricate and supply secondary steel structures.

“This partnership is not only about delivering clean energy – it is about securing international investment, driving economic growth and creating the highly skilled jobs that will sustain our communities for generations, anchored by our best-in-class offshore wind base,” said Matt Beeton , Chief Executive Officer at the Port of Tyne.

The Hornsea 3 offshore wind farm is located 160 kilometres off the Yorkshire coast.

Ørsted was awarded a Contract for Difference (CfD) for Hornsea Three in July 2022, with the developer saying that with an installed capacity of 2.9 GW, Hornsea 3 was the largest single offshore wind farm in the world.

The project, expected to be operational in 2027, will feature around 200 Siemens Gamesa 14 MW turbines, which Cadeler will install.

Related Article

Cadeler Takes Delivery of Wind Ally, Set for First Mission at 2.9 GW Hornsea 3 Project in UK

Reach the offshore wind industry in one go! offshoreWIND.biz is read by thousands of offshore wind professionals every day.

—

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our offshore wind business directory.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

FeaturedHeadlinesBusiness & FinanceContracts & TendersEquipmentFixed-BottomPorts & LogisticsSupply Chain

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Equinor to Deploy Cable Monitoring Tech at 9-Year-Old Offshore Wind Farm
  2. 2All Foundations In Place at Bałtyk 2 & 3
  3. 3OWC-Led Consortium to Perform Feasibility Study for Morocco’s First Offshore Wind Farm
  4. 4Nadara Pinpoints Landfall Location for 1.8 GW Floating Wind Project, Starts Preparing for Offshore Transmission Licence Application

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free