Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›ELWIND Opens Tender for Metocean Survey Campaigns at Estonia, Latvia Offshore Wind Sites
Business & Finance

April 7, 2025 · about 1 year ago

ELWIND Opens Tender for Metocean Survey Campaigns at Estonia, Latvia Offshore Wind Sites

The ELWIND project has launched a tender seeking a contractor to carry out in-situ metocean measurement campaigns for offshore wind farms at Estonia and Latvia sites. According to ELWIND, the campaign must be done by a single provider for the two offshore wind farm sites of the ELWIND project. The s

2 minutes read
  • LinkedIn
  • X
  • Email
Elwind EU co-funding
The Investment and Development Agency of Latvia (LIAA)

The ELWIND project has launched a tender seeking a contractor to carry out in-situ metocean measurement campaigns for offshore wind farms at Estonia and Latvia sites.

According to ELWIND, the campaign must be done by a single provider for the two offshore wind farm sites of the ELWIND project.

The submission deadline for the tenders is 6 May 2025.

The measurement campaign is aimed at providing accurate and validated data on the metocean (meteorological and oceanographic) conditions for the respective offshore wind farm sites of the project.

The collected data will be used as the primary input for the wind resource assessment and can serve as input by companies submitting bids to develop the wind farm.

The obtained metocean data can be used for further analysis to improve the preliminary design of the wind farms, the installation and maintenance of turbines, inter-array cables, substations, and their support structures.

ELWIND is a cross-border project to be built together by Latvia and Estonia, whose governments started discussions to develop it in December 2019 and signed a memorandum of understanding (MOU) to build the offshore wind farm.

In 2022, the two governments pinpointed the locations in their respective parts of the Baltic Sea where the joint project will be built.

The project’s website states that Estonia and Latvia consume approximately 16 TWh of electricity annually, and ELWIND is expected to supply around one-fifth of this demand, or 3 TWh per year.

Related Articles

Authorities

Latvia Greenlights Research Site for ELWIND Cross-Border Offshore Wind Project

1 min read

LinkedIn X Facebook Google News

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Business & FinanceBusiness developmentFixed-BottomResearch & Development

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norway Revises Utsira Nord Floating Wind Support Terms
  2. 2Germany to Auction 4 GW of Offshore Wind Capacity in 2027 Under Revised Site Plan
  3. 3Offshore Substations for Gennaker Wind Farm En Route to Baltic Sea (VIDEO)
  4. 4US Wind Gives Up Sparrows Point Site as Offshore Wind Project Faces Delays

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free