Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fixed-Bottom›Monopile Installation Nears as Offshore Work Starts at Baltic Power
Fixed-Bottom

January 21, 2025 · about 1 year ago

Monopile Installation Nears as Offshore Work Starts at Baltic Power

Preparatory and trial operations for offshore construction are underway at the Baltic Power offshore wind farm site in the Polish sector of the Baltic Sea, with several vessels involved, including Van Oord’s heavy-lift ship Svanen, in advance of the upcoming monopile installation work. Van Oord’s he

1 minutes read
  • LinkedIn
  • X
  • Email
baltic power svanen
Source: Baltic Power

Preparatory and trial operations for offshore construction are underway at the Baltic Power offshore wind farm site in the Polish sector of the Baltic Sea, with several vessels involved, including Van Oord’s heavy-lift ship Svanen , in advance of the upcoming monopile installation work.

Van Oord’s heavy-lift vessel Svanen is currently situated at the Baltic Power site, some 23 kilometres off the Polish coast, according to the latest AIS data. The ship arrived at the Gdynia Port in November 2024.

Svanen , which underwent a gantry upgrade last year, will be responsible for the installation of the monopiles.

The offshore wind farm will consist of 78 monopiles in total – 76 for Vestas’ 15 MW wind turbines and two for offshore substations. Steelwind Nordenham is responsible for the delivery of monopiles, while Belgium-based Smulders will supply the transition pieces.

The monopiles will be up to 100 metres long, with a diameter of approximately 9 metres, and a weight of up to 1,700 tonnes.

YOU MIGHT ALSO LIKE

Recently, the developers behind the Polish project launched a scheme to compensate local shipowners for the restrictions on their fishing activities that result from the construction of the 1.2 GW wind farm.

Scheduled to commence operations in late 2026, the Baltic Power offshore wind farm is expected to deliver renewable energy to over 1.5 million Polish households.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Fixed-BottomProject UpdatesWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Gazelle Tests Floating Wind Platform for 18+ MW Turbines in Typhoon Conditions
  2. 2US Gets New Offshore Wind Farm as All Turbines Installed at 704 MW Revolution Wind
  3. 3Vietnam-Made Cable Layer Enters Into Service in Taiwan
  4. 4Germany’s 960 MW He Dreiht Offshore Wind Farm Inaugurated

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free