Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Survey Starting at Scottish Floating Offshore Wind Project
Business & Finance

July 8, 2022 · about 4 years ago

Survey Starting at Scottish Floating Offshore Wind Project

A geophysical and environmental survey is set to soon commence at the Salamander floating offshore wind project off the coast of Scotland in the North Sea. The geophysical survey and benthic drop-down video and grab survey activities are expected to commence on 26 July at the earliest and run until

1 minutes read
  • LinkedIn
  • X
  • Email
Survey Starting at Scottish Floating Offshore Wind Project
Simply Blue Energy. Source: Notice to Mariners

A geophysical and environmental survey is set to soon commence at the Salamander floating offshore wind project off the coast of Scotland in the North Sea.

The geophysical survey and benthic drop-down video and grab survey activities are expected to commence on 26 July at the earliest and run until 30 September at the latest, in case of weather delays or downtime.

The geophysical scope of work will be divided into three main areas, including the offshore wind farm array area, offshore section of the export cable route, and nearshore section of the export cable route.

Ocean Infinity will conduct the offshore geophysical survey using Northern Franklin, while SEP Hydrographic will carry out the nearshore geophysical survey using Mersey Discovery.

The geophysical survey will include multibeam echosounder (MBES), acoustic MBES backscatter (ABS), side-scan sonar (SSS), magnetometer (MAG), and high-frequency sub-bottom profiler (SBP) data.

Its aim is to also provide the necessary data to feed into the Environmental Impact Assessment (EIA) process.

Related Articles

Business & Finance

Simply Blue Energy and Subsea 7 to Develop Floating Wind Project in Scotland

2 min read

The 100 MW Salamander project is being developed by Simply Blue Energy Scotland (SBES).

It is located approximately 35 kilometres east of Peterhead in the Northeast of Scotland, in an outline area of interest of approximately 67 square kilometres with water depths up to 115 metres.

Ørsted joined the joint venture behind the project and acquired a majority stake in April.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Business & FinanceGrid ConnectionWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Pacifico Energy Launches Survey Campaign for 1.8 GW Offshore Wind Projects in Vietnam
  2. 2Inter-Array Cable Installation About to Start at 2.9 GW UK Offshore Wind Farm
  3. 3Ørsted Orders Third Saab Seaeye Cougar ROV for Offshore Wind Operations
  4. 4Hampidjan Advant to Equip Cadeler's Wind Ace for East Anglia Two Job

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free