Advertisement

Wind Farm Update

about 5 years ago

MMA Completes Survey Work at Formosa 2

MMA has completed a survey work scope at Formosa 2 offshore wind project located off the coast of Taiwan. MMA reports having carried out several potential unexploded ordnance target investigations as well as 168 km of magnetometer survey line from its support DP2 vessel MMA Prestige. The 376 MW Form

1 minutes read
MMA Completes Survey Work at Formosa 2
MMA Offshore

MMA has completed a survey work scope at Formosa 2 offshore wind project located off the coast of Taiwan.

MMA reports having carried out several potential unexploded ordnance target investigations as well as 168 km of magnetometer survey line from its support DP2 vessel MMA Prestige.

The 376 MW Formosa 2 offshore wind farm is a joint venture project developed by a partnership between JERA, Macquarie’s Green Investment Group, and Swancor Renewable Energy.

It will comprise 47 Siemens Gamesa 8 MW turbines installed in water depths of up to 55 metres.

Formosa 2 started construction in June 2021 and is scheduled to be put into operation this year.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.