Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Kongsberg Joins Hywind Tampen Crew
Contracts & Tenders

January 21, 2021 · about 5 years ago

Kongsberg Joins Hywind Tampen Crew

Kongsberg Maritime has secured a contract with Wood to supply positioning and monitoring equipment for the Hywind Tampen floating offshore wind farm. Kongsberg will supply its DPS position reference system and Motion Reference Unit (MRU) for what will be the world’s largest floating offshore wind fa

1 minutes read
  • LinkedIn
  • X
  • Email
Kongsberg Joins Hywind Tampen Crew
Equinor

Kongsberg Maritime has secured a contract with Wood to supply positioning and monitoring equipment for the Hywind Tampen floating offshore wind farm.

Kongsberg will supply its DPS position reference system and Motion Reference Unit (MRU) for what will be the world’s largest floating offshore wind farm.

The DPS exploits all available GNSS infrastructure to deliver position information and is suited to monitor the location of the turbines relative to the seabed, the company said.

The MRU will check roll, pitch, yaw and heave motion, informing the blade trimming system to ensure that the turbine is not overloaded in strong winds and thus likely to become unstable. Marine traffic situational awareness and visibility to other vessels will be facilitated by the AIS AQ610 base station.

Hywind Tampen will feature 11 Siemens Gamesa 8 MW turbines installed about 140 km off the Norwegian coast in water depths of between 260 and 300 m.

Construction on the 88 MW project started in October 2020.

Once operational at the end of 2022, the wind farm will be directly connected to the Snorre A and B and Gullfaks A, B and C oil & gas platforms.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Contracts & Tenders

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1GS Entec Completes Monopile Factory in Korea
  2. 2PGE and Ørsted Add BGB Group to Baltica 2 Offshore Wind Team
  3. 3Fugro Wins UXO Survey Contract for German Offshore Grid Connections
  4. 4Seaway7 Completes Inter-Array Cable Installation at East Anglia Three Offshore Wind Farm

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free