Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Port of Amsterdam to Build Offshore Wind Hub
Operations & Maintenance

April 17, 2020 · about 6 years ago

Port of Amsterdam to Build Offshore Wind Hub

The Port of Amsterdam will turn a dredging depot at the former Averijhaven into an energy port to serve as a base for the construction and maintenance of offshore wind farms. The port is carrying out the Energiehaven project in collaboration with the province of North Holland, the municipality of Ve

1 minutes read
  • LinkedIn
  • X
  • Email
Port of Amsterdam to Build Offshore Wind Hub
Port of Amsterdam

The Port of Amsterdam will turn a dredging depot at the former Averijhaven into an energy port to serve as a base for the construction and maintenance of offshore wind farms.

The port is carrying out the Energiehaven project in collaboration with the province of North Holland, the municipality of Velsen, Tata Steel, and the Port of IJmuiden.

Energiehaven will spread over 15 hectares and comprise both the area of ​​the Averijhaven and Tata Steel’s 5-hectare site to set up a public harbour area for offshore wind.

The site is located on the North Seaside, in front of the sea locks in IJmuiden.

The location is described as ideal for the construction and servicing of the Hollandse Kust West and IJmuiden Ver offshore wind farms, among others, the port said.

Energiehaven will feature a quay of 580 metres, 200 metres of which will be a heavy-duty quay with a water depth of 12.5 metres. The remaining 380 metres will be a standard quay with a water depth of ten metres.

The work on developing the project will start in 2020. The next steps in the project will be to empty the dredging depot at the former Averijhaven and to carry out an Environmental Impact Assessment for the project.

The Port of Amsterdam and Zeehaven IJmuiden will operate Energiehaven once completed.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Operations & MaintenancePorts & Logistics

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Boskalis to Install Inter-Array Cables at 1 GW Dutch Offshore Wind Farm
  2. 2Victoria Identifies Preferred Transmission Route for First Offshore Wind Projects
  3. 3China Three Gorges Connects First Qingzhou V & VII Offshore Wind Turbines to Grid
  4. 4Ørsted's First UK Offshore Wind Farm Marks 20 Years of Operation

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free