Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›RTE Seeking Survey Services for Celtic Interconnector
Contracts & Tenders

April 6, 2020 · about 6 years ago

RTE Seeking Survey Services for Celtic Interconnector

Réseau de Transport d’Electricité (RTE) has issued a tender for a nearshore geophysical, UXO and geotechnical campaign at the landfall of the Celtic Interconnector. The scope includes integrated nearshore surveys to be performed at the French landfall of the Celtic Interconnector mainly in water dep

1 minutes read
  • LinkedIn
  • X
  • Email
RTE Seeking Survey Services for Celtic Interconnector
Illustration.

Réseau de Transport d’Electricité (RTE) has issued a tender for a nearshore geophysical, UXO and geotechnical campaign at the landfall of the Celtic Interconnector.

The scope includes integrated nearshore surveys to be performed at the French landfall of the Celtic Interconnector mainly in water depth ranging between 0 and approximately 30m LAT.

The geophysical investigation will include both surface and subsurface surveys (subbottom profiling).

Deep geotechnical ground-truthing shall be performed nearshore to characterize the materials which would be drilled during cable installation works by the means of horizontal directional drilling.

The duration of the contract is one year. The deadline for submitting applications for the tender is 24 April by 16:00 local time.

The Celtic Interconnector electricity link between Ireland and France is being developed by RTE France and EirGrid.

The link, which will be able to transmit up to 700MW of electricity and provide a direct fiber-optic communications link between the two countries, is scheduled to go live in 2026.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Contracts & TendersGrid Connection

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1German Offshore Wind Vessel Operator Acquires 50 Pct Stake in Norwegian Crewing Company
  2. 2Dajin Heavy Industry Adds Third Large Deck Transport Vessel to Its Fleet
  3. 3Tekmar Nets EUR 6 Million Contract Extension in Offshore Wind
  4. 4Subsea Micropiles to Invest GBP 5 Million in Expanding Manufacturing, Offshore Ops at Scottish Port

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free