Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›Mech-Tool Engineering Wins Hollandse Kust Zuid Alpha Work
News

December 24, 2019 · about 6 years ago

Mech-Tool Engineering Wins Hollandse Kust Zuid Alpha Work

DryDocks World has awarded Mech-Tool Engineering (MTE) with a contract to deliver fire and blast solutions to the Hollandse Kust Zuid Alpha project. MTE will design, engineer, fabricate, and supply its A0 fire-rated and Non-Rated (NR) external and internal profiled wall panels for the offshore platf

1 minutes read
  • LinkedIn
  • X
  • Email

DryDocks World has awarded Mech-Tool Engineering (MTE) with a contract to deliver fire and blast solutions to the Hollandse Kust Zuid Alpha project.

MTE will design, engineer, fabricate, and supply its A0 fire-rated and Non-Rated (NR) external and internal profiled wall panels for the offshore platform.

MTE has recently started the fabrication of the walls in the Mech-Tool Korea facility.

“The confidence shown by DryDocks World Dubai and their client Petrofac, in selecting Mech-Tool Engineering as the successful bidder for the supply of the fire rated walling package is of great importance to us,” Craig Rose , MTE’s BD Strategy & Proposals Director, said.

”The MTE Renewable division are proud to continue the trusted association with Petrofac following-on from the recent Galloper topsides project and we look forward to the growth of a valued relationship with the world class DDWD Yard of the UAE.”

Drydocks World is responsible for the construction, engineering, commissioning and load-out of the 700MW topside for the Alpha platform .

The 2,800t jacket is expected to be installed in the second quarter of 2020, with the 3,800t topside following in the fourth quarter of next year. The platform will go into service in 2021.

The 1.4GW Hollandse Kust Zuid zone comprises four offshore wind farms that will be connected to both the Alpha and Beta substations. The wind farms are being developed by Vattenfall.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EIB Backs Lithuanian Port's Offshore Wind Upgrade
  2. 2UK Approves Transmission Infrastructure for Morecambe and Re-Tendered Morgan Offshore Wind Farm
  3. 3ORE Catapult Launches Celtic Sea Marine Mammal Monitoring Project
  4. 4EEW SPC Prepares Rostock Plant for 12-Metre-Diameter Monopiles, Eyes Further Upgrade After 2030

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free