Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Vessels›CMHI Lays Keel for OHT Heavy Lifter
Vessels

October 4, 2019 · about 7 years ago

CMHI Lays Keel for OHT Heavy Lifter

China Merchants Heavy Industry (CMHI) has laid the keel for Offshore Heavy Transport’s (OHT) new semisubmersible wind farm foundation installation vessel Alfa Lift. CMHI is constructing the Ulstein-designed vessel at its facility in Jiangsu under an order it received from OHT in July last year. Acco

1 minutes read
  • LinkedIn
  • X
  • Email

China Merchants Heavy Industry (CMHI) has laid the keel for Offshore Heavy Transport’s (OHT) new semisubmersible wind farm foundation installation vessel Alfa Lift.

CMHI is constructing the Ulstein-designed vessel at its facility in Jiangsu under an order it received from OHT in July last year.

According to OHT, for the first time the fabricated blocks have come together for assembly in the dry dock and the vessel will start to take shape.

“We have worked together with the shipyard in an open and cooperative way to ensure the utmost quality of construction,” said OHT’s CEO Torgeir Ramstad . “According to our customers our vessel will be ground-breaking and will serve the growing offshore wind market for decades to come. The word “growing” is perhaps not precise enough to describe what is happening in the offshore wind market.”

Alfa Lift is designed to install all types of bottom-fixed offshore wind foundations and will transport and install topsides and subsea modules, in addition to other heavy cargoes within oil & gas.

Featuring a free deck length of 148m, and a free deck area of 8,100m² (main) + 2,470 m² (foredeck), the vessel has accommodation for 100 people. It has a total length of 216.3m, and a breadth of 56m.

The launching ceremony is planned for March 2020, with Alfa Lift due to be delivered in early 2021.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Vessels

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PGE and Ørsted Add BGB Group to Baltica 2 Offshore Wind Team
  2. 2Fugro Wins UXO Survey Contract for German Offshore Grid Connections
  3. 3Seaway7 Completes Inter-Array Cable Installation at East Anglia Three Offshore Wind Farm
  4. 4Crewing SOVs and CTVs: Where Wind Operators Will Find Their Next Crews

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free