Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Vessels›Manor’s Next-Gen WFSV Getting Ready for Construction
Vessels

November 13, 2018 · about 8 years ago

Manor’s Next-Gen WFSV Getting Ready for Construction

Manor Renewable Energy (MRE) Ltd is preparing to construct a second wind farm service vessel (WFSV) at its fabrication and engineering facility in Portland, UK.

1 minutes read
  • LinkedIn
  • X
  • Email

Manor Renewable Energy (MRE) Ltd is preparing to construct a second wind farm service vessel (WFSV) at its fabrication and engineering facility in Portland, UK.

The UK-based company announced in February that it had received a GBP 50,000 grant from the SCORE fund to help design a sister vessel to Manor Venture .

The new vessel will also be built in conjunction with Walker Marine Design, fully classed by Bureau Veritas and UK-flagged.

According to Operations Director Leif Cooper, the company has adapted and modified the Manor Venture design from lessons learned over the last 18 months, but the core design and operational ethos remain the same.

”This is a vessel that will be able to work anywhere in Europe and has the capability to stay offshore on the next generation of wind farm projects for prolonged periods; minimising the transit time, reducing costs and massively increasing the productivity,” Cooper said.

The new-build vessel will have a maximum speed of 25kn, a tank with a 45t capacity and extensive workable deck space and craneage, the company said.

It will have the capacity to accommodate 24 staff for direct personnel transfer operations or alternatively for more project related scopes, as well as onboard capacity for 18 persons.

MRE expects the vessel to be delivered in the latter part of next year.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Vessels

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Subsea Micropiles to Build Manufacturing Facility at Montrose Port
  2. 2Equinor Assembles Celtic Sea Offshore Wind Scoping Report Team
  3. 3Greenpeace Threatens Legal Action Over Crown Estate Fees for Morgan Offshore Wind Farm
  4. 4Acta Marine Christens CSOV Chartered by Vestas

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free