Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›E.ON to Build 10MW Lithium-Ion Battery for UK Grid
News

September 14, 2016 · about 10 years ago

E.ON to Build 10MW Lithium-Ion Battery for UK Grid

E.ON will build a 10MW lithium-ion battery for the UK grid, after being awarded a contract from the National Grid to support the power network’s stability with a battery system that will help balance power demand and supply in real time and allow for an increase in the share of renewable energy in t

1 minutes read
  • LinkedIn
  • X
  • Email

E.ON will build a 10MW lithium-ion battery for the UK grid, after being awarded a contract from the National Grid to support the power network’s stability with a battery system that will help balance power demand and supply in real time and allow for an increase in the share of renewable energy in the grid.

With the strong growth of weather-dependent renewable sources such as wind and solar, the amount of power fed into the grid is becoming increasingly volatile. Therefore, National Grid had launched a tender for a new service to deal with volatile fluctuations and awarded 8 contracts.

Batteries are expected to play a key role in the new energy world largely dominated by renewable sources, E.ON said.

At times of either an oversupply or an under-supply, E.ON’s battery system will respond within one second absorbing or discharging power into the local distribution network to which the battery is connected and thus maintaining the system frequency at a safe level.

The company will build the 10MW battery at its Blackburn Meadows Biomass CHP and District Heating site near Sheffield.

The system is planned to be operational by the start of 2018.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ScottishPower Renewables Completes ‘Record-Breaking’ Cable Landfall Operation for East Anglia Two
  2. 2Bidding Period Closes for 10 GW French Offshore Wind Tender
  3. 3DEME to Install Wind Turbines at Vattenfall and CIP’s 1 GW Dutch Offshore Wind Farm
  4. 4Acciona Selected for Victoria’s 2 GW Offshore Wind Transmission Project

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free