Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›Power CSL Launches Fast-Install HV Subsea Cable Jointing System
News

May 30, 2016 · about 10 years ago

Power CSL Launches Fast-Install HV Subsea Cable Jointing System

Power CSL has launched a high voltage jointing system suitable for the offshore repair of a wide range of high voltage subsea cables. According to the company, the system will drastically reduce the cost of repairing subsea cables in the offshore renewables and oil & gas sectors, since it takes 48-6

1 minutes read
  • LinkedIn
  • X
  • Email

Power CSL has launched a high voltage jointing system suitable for the offshore repair of a wide range of high voltage subsea cables.

According to the company, the system will drastically reduce the cost of repairing subsea cables in the offshore renewables and oil & gas sectors, since it takes 48-60 hours to install it, cutting down the waiting time for a suitable weather window and repair vessel time on station.

Pat Oakley , the company’s director, said: “Several years of research and analysis have gone into developing this joint, which has many advantages over other repair solutions, particularly in terms of cable range-taking capability and ease of installation.

“The jointing system is not associated with the cables of any particular manufacturer and its modular design can be configured for a wide range of connections.

“This product will substantially increase the UK and European supply chain capacity for HV subsea cable repair, improving the availability of trained jointers and radically reducing the time it takes to repair faults on critical subsea power connections.”

Power CSL added that, although it provides its own offshore technicians for joint installation, it also offers a training programme for suitably qualified personnel from client companies. “We would simply offer the joint in kit form so that the clients’ trained technicians can install the product offshore. It’s another significant cost-saving factor and puts response time in the client’s control,” Oakley said.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norway Revises Utsira Nord Floating Wind Support Terms
  2. 2Germany to Auction 4 GW of Offshore Wind Capacity in 2027 Under Revised Site Plan
  3. 3Offshore Substations for Gennaker Wind Farm En Route to Baltic Sea (VIDEO)
  4. 4US Wind Gives Up Sparrows Point Site as Offshore Wind Project Faces Delays

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free