Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Authorities›Balfour Beatty Pleads Guilty to 2010 Fatal Accident, Fined GBP 2.6 Million
Authorities

May 16, 2016 · about 10 years ago

Balfour Beatty Pleads Guilty to 2010 Fatal Accident, Fined GBP 2.6 Million

Balfour Beatty Utility Solutions Limited has been fined GBP 2.6 million after a 32-year-old subcontractor, working on behalf of the company, was killed when the trench he was working in collapsed on him, Health and Safety Executive (HSE) reported. On 14 April 2010, the worker was laying ducting for

1 minutes read
  • LinkedIn
  • X
  • Email

Balfour Beatty Utility Solutions Limited has been fined GBP 2.6 million after a 32-year-old subcontractor, working on behalf of the company, was killed when the trench he was working in collapsed on him, Health and Safety Executive (HSE) reported.

On 14 April 2010, the worker was laying ducting for a new cable for an offshore wind farm that was being built off the coast by Heysham, Lancashire. The trench was dug to a depth of 2.4 metres, without any shoring. The man was killed when he became trapped in the trench after it collapsed on him.

Balfour Beatty Utility Solutions pleaded guilty at Preston Crown Court on 5 May, after an investigation by the HSE, and was fined GBP 2.6million with GBP 54,000 costs.

The Court heard that the company failed to adequately risk assess the works or control the way in which the excavation took place.

HSE inspector Chris Hatton said after the hearing: “The level of this fine should serve as a warning to industry not to ignore health and safety matters.

“Balfour Beatty failed to adequately assess, plan and supervise the work being undertaken.”

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Authorities

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1US Gov’t Seeks New Review of US Wind’s Maryland Project
  2. 2Former RWE Offshore Wind CEO Joins Esvagt Board
  3. 3UK’s First HVDC Subsea Cable Factory Opens in Scotland
  4. 4Diverse Marine to Build Three More CTVs for OEG

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free