Advertisement

Wind Farm Update

about 10 years ago

First Hywind Scotland Foundation Taking Shape

The Navantia-Windar joint venture has erected the first block for the first of five spar-type floating foundations for Statoil’s Hywind Scotland project. The block weighs approximately 70t, and has a diameter of 14.4m. Five blocks with maximum weight of 800t will be assembled and moved onto the slip

1 minutes read

The Navantia-Windar joint venture has erected the first block for the first of five spar-type floating foundations for Statoil’s Hywind Scotland project.

The block weighs approximately 70t, and has a diameter of 14.4m.

Five blocks with maximum weight of 800t will be assembled and moved onto the slipways for assembly of 90m long spar units and subsequent launching.

The launching weight of the floating foundations is around 3,200t, including more than 1,000t of high density concrete.

The contract for fabrication of five floating foundations was awarded to the Navantia-Windar joint venture by Statoil’s subsidiary Hywind Scotland Ltd. in June 2015.

The fabrication of the structures is taking place at the Navantia yard located in Fene, Spain, where Navantia-Windar is also constructing 29 jacket foundations for Ibedrola’s Wikinger project.

Advertisement

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.