Advertisement

Wind Farm Update

about 11 years ago

OSB Rolls First Can for Burbo Bank 2 TP

Offshore Structures (Britain) (OSB) has completed the first can that is part of one of the transition pieces for the Burbo Bank Extension project ahead of schedule. In total, 144 cans will be rolled at OSB, a joint venture between EEW Special Pipe Construction GmbH and Bladt Industries, located by t

1 minutes read

Offshore Structures (Britain) (OSB) has completed the first can that is part of one of the transition pieces for the Burbo Bank Extension project ahead of schedule.

In total, 144 cans will be rolled at OSB, a joint venture between EEW Special Pipe Construction GmbH and Bladt Industries, located by the Teesside River in the UK.

The total number of transition pieces being fabricated at OSB is 16 and the total number of transition pieces for the project is 32.

The remaining 16 transition pieces will be fabricated by Bladt Industries in Aalborg, Denmark and the 32 monopiles will be fabricated by EEW SPC in Rostock, Germany.

Image: Bladt

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.