offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Technology›Evopod Survives 6-Month Trials
Technology

March 12, 2015 · about 11 years ago

Evopod Survives 6-Month Trials

Since the 7th of August 2014 E35 has successfully completed six months of continuous deployment in Sanda Sound. The trials have demonstrated Evopod’s low motions and survivability characteristics in the moderately fast flowing (4 to 5 knots) tidal site, which in the winter months is also exposed to

1 minutes read
  • LinkedIn
  • X
  • Email

Since the 7th of August 2014 E35 has successfully completed six months of continuous deployment in Sanda Sound.

The trials have demonstrated Evopod’s low motions and survivability characteristics in the moderately fast flowing (4 to 5 knots) tidal site, which in the winter months is also exposed to a harsh wave environment from the Atlantic and Irish Sea.

The floating platform’s streamline surface piercing struts and turret mooring ensure that the device always faces into the flow whatever the wave direction while the small waterplane area of the struts and the device’s deeply submerged tubular hull ensure that the buoy has very low motions compared to more conventional surface floating platforms or buoys. The unit rode out a particularly severe “weather bomb” storm in December which combined spring tides with record breaking wind speeds and wave heights which led to shipping being constrained to port and the downing of power lines.

The E35-01 unit in Sanda Sound is fitted with a 35kW rated generator driven by a 4.5m diameter turbine. The unit will be exporting electricity into the grid later in 2015 via an umbilical and subsea cable connection. The umbilical and seabed power cable also transmit data to the company’s onshore control and monitoring container which is sited 0.75 nautical miles from the device’s moored location.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Scotland Finances Plans to Produce Floating Offshore Wind Foundations at Port of Ardersier
  2. 2DWT Returns to Riffgat Offshore Wind Farm
  3. 3Formosa 6 Offshore Wind Farm and Star Trade Enter Corporate Power Purchase Agreement
  4. 4TetraSpar Floater Completes Five-Year Testing Campaign Offshore Norway

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free